5

Putting into operation

This chapter describes how the instrument is installed and gives instructions on initial startup.
NOTE
Inspect the instrument for damages during unpacking. If necessary, prepare a status report immedi-
ately to inform the postal company, railway company or transportation company.
Keep the original packaging for future transportation.
5 .1

Installation site

Place the instrument on a stable, horizontal plane and consider the maximum product dimensions.
Perform the distillations under vacuum with the Rotavapor placed under a fume hood. If this is not
possible due to shortage of space, mount the protective shield (optional accessory) and lead the
exhaust gas from the pump into the fume hood.
5 .2

Electrical connections

ATTENTION
Make sure that the voltage on the socket corresponds to the voltage given on the type plate of the
instrument.
Always connect the instrument to an earthed socket. External connections and extension cables
must be provided with an earthed conductor lead (3-pole couplings, cable or plug equipment) as the
mains lead has a molded plug, thus avoiding risks due to inadvertent defective wiring.
Make sure that no electric sparks form in the instrument or its surroundings as they might damage
the instrument.
5 .3

Commissioning the heating bath

Place the bath on the base plate of the Rotavapor.
Fig. 5.1: Moving the heating bath
32
If you need to adjust the position of the bath, lift
it up slightly at the right-hand side and pull or
push it to the desired position.
R-210/215 Operation Manual, Version F
5 Putting into operation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the B-491 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Buchi B-491

  • Page 1 5 Putting into operation Putting into operation This chapter describes how the instrument is installed and gives instructions on initial startup. NOTE Inspect the instrument for damages during unpacking. If necessary, prepare a status report immedi- ately to inform the postal company, railway company or transportation company. Keep the original packaging for future transportation.
  • Page 2 5 Putting into operation Saving energy For heating baths there are various ways to save energy. By using floating balls in the water bath, evaporation of water is reduced. As a result, the bath heating has to switch on less often. This measure helps to save up to 50 % of energy.
  • Page 3 • Install the protective shield (optional accessory) only to a cold heating bath. 6 .1 .2 Switching the B-491 from water bath mode to oil bath mode To switch the heating bath from water bath mode to oil bath mode, proceed as follows: •...
  • Page 4 6 Operation 6 .1 .3 Switching the B-491 from oil bath mode to water bath mode To switch the heating bath from oil bath mode to water bath mode, proceed as follows: • Switch off the heating bath. • Turn the adjusting knob to any position except for 0 °C or 180 °C.