9.0 OPERATION AND INSPECTION CHECKLIST
BEFORE EACH USE the device must be inspected to this checklist
1. There is no obvious damage such as missing, broken or loose parts, damaged labels, etc.
2. The waterway is clear of obstructions and the turbine is free of debris.
3. Coupling is tight and leak free.
BEFORE BEING PLACED BACK IN SERVICE, device must be inspected to this checklist;
1. There are no broken or missing parts.
2. There is no obvious damage to the device that could impair operation (e.g. dents, cracks, corrosion, or other defects).
3. The thread and gasket are in good condition.
4. The waterway is clear of obstructions and internal turbine is free of debris.
5. Device is clean and markings are legible.
6. Coupling is retightened properly.
Equipment failing any part of the checklist is unsafe for use and must have the problem corrected
WARNING
before use or being placed back into service. Operating equipment that has failed the checklist is
a misuse of this equipment.
TASK FORCE TIPS LLC
MADE IN USA • TFT.com
©Copyright Task Force Tips LLC 2019
3701 Innovation Way, Valparaiso, IN 46383-9327 USA
800-348-2686 • 219-462-6161 • Fax 219-464-7155
LIE-100 December 30, 2019 Rev04