7-2. Check Items before Test Operation (before powering-on)

Prior to the test operation, check the following items to verify there are no problems with the installation work.
Main check items for electric wiring
The communication system differs from that of R22 or R407 refrigerant "Modular Multi System" air conditioners.
Check wiring points again carefully.
(1) In the case that a central control system is not connected:
Outdoor unit
Indoor unit
(1) Are the indoor and outdoor communication lines of the outdoor unit connected to the U1/U2 terminals?
(2)Is the relay connector between the U1/U2 terminal and the U3/U4 terminal disconnect? (Set up at
shipment from the factory)
(3)Is the terminator resistor (SW30-bit 2) on the interface PC board of the outdoor unit turned on? (Set
up at shipment from the factory)
(4) Is the end terminal of the shield wire open?
(5) Is the end terminal of the shield wire earthed at the outdoor unit side?
NOTE
The figure above does not show all the electric wires.
For details, refer to the installation manuals for the outdoor unit, indoor unit, remote controller, or optional devices.
(1)
(2) (3)
U3
U4
U1
U2
(5)
U1
U2
U1
U2
U1
U2
A
B
A B
Remote
Remote
Remote
controller
controller
controller
M
a
n i
c
h
e
c
k
i
e t
m
s
- 76 -
(4)
U1
U2
A B
A
B
C
h
e
c
k

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents