10.1 Preparation
Take the appliance out of the packaging.
Remove all packaging material including polystyrene base, keep them out of childrens
reach.
While opening the package, water drops may be seen on plastic bag and porthole.
This normal phenomenon results from water tests in the factory.
Note: Packaging disposal
Keep all packaging materials out of children´s reach and dispose them in an environ-
mentally friendly manner.
10.2 OPTIONAL: Install noise reduction pads
1. When opening the shrink package, you will fi nd
some noise reduction pads.These are used for re-
ducing noise. (Fig. 10-1)
2.
Lay the washing machine down to its side, porthole
pointing upwards, bottom side towards operator.
3. Take out the noise reduction pads and remove
the double-sided adhesive protective film;paste
around the bottom;the noise reduction pads
under the w- ashing machine cabinet as shown in
Figure 3.(two longer pads in position 1 and 3, two
shorter pads in position 2 and 4). Finally set the
machine upright again.
10.3 Dismantle the transportation bolts
The transport protection on the rear side is designed
for clamping anti-vibration components inside the ap-
pliance during transportation to prevent inner dam-
age. All elements (I, R, S and T , Fig 10-2) must be re-
moved before use.
1. Remove all 4 bolts (T1 - T4) (Fig. 10-3).

10-Installation

2 .
1.
2.
2x
2x
3.
R7
R9
R10
R8
S1
S2
I1
T1
T3
10-1
10-1
10-2
R5
R6
10-3
T2
T4
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents