VBM DOMOBAR Instruction Manual page 54

Hide thumbs Also See for DOMOBAR:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 39
7.2,
FIRST START.
· Load water as described in paragraph "Water load".
· Press the line switch (1) which lights up and the water
heating is activated, the logo (A) appears on the display.
· Wait for the boiler water temperature to be reached,
indicated by the appearance of screen (B) on the display.
· Lift the lever (2) and hold it up until of the group (3)
comes water, indicating that the boiler is full of water,
and then lower the lever (2).
· Turn off the machine by pressing the main switch (1)
again.
7.3,
START.
· Press the line switch (1) which lights up and the water
heating is activated, the logo (A) appears on the display.
· Wait for the boiler water temperature to be reached,
indicated by the appearance of screen (B) on the display
at this point the machine is ready to be used.
18
A
3
B
1
2

Advertisement

Table of Contents
loading

Table of Contents