Adjustments - Scotsman C0522R Installation Manual

Hide thumbs Also See for C0522R:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Adjustments

Bridge Thickness - For the Service Tech Only
1. Push and hold Off till the machine stops.
2. Remove evaporator cover.
3. Remove curtain.
4. Use a hex wrench and rotate the bridge
thickness adjustment screw in 1/8 turn
increments CW to increase bridge thickness.
Rotate CCW to decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
5. Return curtain and evaporator cover to their
normal positions.
6. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Water Purge Setting
The water purge is factory set to automatically
adjust the amount of water purged per cycle. The
setting can be changed to one of 5 manual settings
or left on automatic.
Purge
1 - Minimum
setting
Water
RO water or
Type
equivalent
To set:
1. Switch the machine OFF by holding the Off
button in until a number or the letter A shows
on the display.
2. Press and release the On button repeatedly
until the number on the display corresponds to
the desired setting.
Remote Condenser Models - Installation Manual
2 -
3 -
Moderate
Standard
Low TDS
Setting for
non - RO
typical
water
water
June 2007
Page 17
Too Big
Just Right,
small cube
Ice Bridge Thickness Check
Bridge Thickness Adjustment Mechanism
4 - Heavy
5 - Maximum
High TDS
Very High
water
TDS water
3. Press and release the Off switch again to
return to the normal control state.
C0522 through C1030
Just Right,
Too Small
med cube
A - Automatic
Factory setting,
suitable for any
water with
conductivity not
less than 10
microSiemens/cm.

Advertisement

Table of Contents
loading

Table of Contents