Ferno 175 Series Technical Service Bulletin page 3

Antler and rail fastening system
Table of Contents

Advertisement

3
Inspect the Rail
1.
Inspect the rail (Figure 4). Verify it is properly secured to the floor
or wall, and all fasteners are tight and present.
2.
Inspect the clamp that secures the rail to the bracket. Is the rail
clamp in the proper location? The clamp may be moved up or
down on the bracket (Figure 5 and Figure 6). Verify the rail is held
at the proper height for the cot retaining post.
WALL BRACKET
The rail clamp can be
mounted at any of three
positions.
Use the position that
best allows the rail jaws
to grasp the center of the
fastener post on the cot.
FLOOR BRACKET
The rail clamp can be
mounted at any of three
positions.
Use the position that
best allows the rail jaws
to grasp the center of the
fastener post on the cot.
© Ferno-Washington, Inc. / 234-3601-00
Ferno Technical Service Bulletin
Removable
Floor-Mounted Rail
Wall-Mounted Rail
Permanent
Floor-Mounted Rail
4
5
6
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

175-1175-2175-3175-4175-5

Table of Contents