Download Print this page

Screen Technics ELECTRICINEMA Manual page 14

Connect ip projection screen
Hide thumbs Also See for ELECTRICINEMA:

Advertisement

Operate IR Group
Command
20
21
22
23
26
Switch Group Commands
a. Switch group control can be used to control screens directly if connected via Connect
Network including the Connect IP module
b. Each module will require programming via register 74, as per point 11 in document
c. Example of direct command
Connected to 192.168.0.32:3001 – command 20 1 - would see all screens programmed to
operate on Switch group 1 move to up position
d. Command followed by value 0 operates all modules connected via Connect Network
including the Connect IP module
Operate Switch Group
Command
10
11
12
13
16. Programming Partial Positions 1 & 2
a. Before partial positions can be programmed, the screen must be calibrated – Calibration is
done by sending the below command. eg. to calibrate screen 1 a code of 192.168.0.32:3001
command 042 17 using Unified address would see the screen calibrate
b. Calibration command can also be sent from the PC Connect software
Command
42
IR Group
IR Group 1 to 9, 0
IR Group 1 to 9, 0
IR Group 1 to 9, 0
IR Group 1 to 9, 0
IR Group 1 to 9, 0
Switch Group
SWITCH Group 1 to 9, 0
SWITCH Group 1 to 9, 0
SWITCH Group 1 to 9, 0
SWITCH Group 1 to 9, 0
MAF Address + 16
Unified Address
Description
Operate IR Group UP
Operate IR Group PARTIAL 1
Operate IR Group PARTIAL 2
Operate IR Group DOWN
Operate IR Group STOP
Description
Operate Switch Group UP
Operate Switch Group PARTIAL 1
Operate Switch Group PARTIAL 2
Operate Switch Group DOWN
Value 1
3781