Miele PG 8583 Operating Instructions Manual page 27

Laboratory glassware washer

Advertisement

Commissioning
completed
Fault 420
Commissioning is completed when the following message is
displayed.
Confirm the message with OK.
The machine is now ready for use.
The settings made during the commissioning process are only
adopted after a complete program has been run.
Select any program, e.g.:
Press the Start/Stop button to start the program.
After commissioning every program starts with reactivation of the
water softener.
If the program is canceled using
connections are deactivated.
Confirm the error message with OK.
Switch the machine off using the  button.
Wait approximately 10 seconds before switching the machine on
again with the  button.
The commissioning procedure starts again.
Perform commissioning and activate at least one plumbing
connection; e.g. for cold water.
Set up successful
Universal
Temperature
75 °C
Duration
1:30
Drain
.
Fault 420
Commissioning
h
, all the plumbing
27

Advertisement

loading

This manual is also suitable for:

62858371cdn