9. Undo the first pair of supporting clamps and lower the pump set until the
second pair of supporting clamps rests on the sturdy beams.
10. Repeat these steps for every pipe section, lowering the pump set into the well
until the installation depth H

5.3.1 Attaching the cable ties

The cables shall be fixed to the riser pipe by a cable tie each on both sides of the riser
pipe flange or socket. Attach a cable tie every 3 metres. Implement this arrangement
over the entire length of the riser.
2
1
3
4
5
Sizes 2, 3, 3a, 3b, 4
1 = turnbuckle (reusable)
2 = cable guard
3 = power cable
4 = metal strap
5 = riser
1. Cut metal strap (4) to the required length L (L = circumference of riser pipe +
approx. 200 mm allowance) and bend both ends inwards by approx. 100 mm.
2. Fully open the turnbuckle (1) and attach it to one end of the metal strap.
3. Place the cable guard (2) around the power cable (3). Guide it around the riser
(5) together with the metal strap (4). Then attach the other end of the
turnbuckle (1) to the metal strap (4).
4. Tighten the turnbuckle (1) with a screwdriver so that the power cable (3) cannot
slip downwards by its own weight!