INSTRUCTIONS - VIEWMASTER PRO
STEP 6.
Holding screen in position tighten up
Allen screw at each end and check that the
top pins have hooked into the T section of
the screen canister.
STEP 7.
Ensure projection screen is latched
into the bracket as shown.
CEILING MOUNT INSTRUCTIONS
Below is a photo showing a side view using the brackets for ceiling fixing, you would follow the
instructions for the wall mounting system, with the only difference being the screen is mounted
hard against the ceiling. It is important that adequate support is supplied by the ceiling
structure to support the screen and to ensure a safe installation. Never rely just on the Gyprock
for attachment.
Hanging Mount Instructions (Requires optional eye bolts)
See photo showing a side view using the brackets for
hanging, two hanging rings are optional; attach the
brackets to the canister as per point 6 in instructions.
Please ensure the hanging points are secured to a
suitable structure.
Projection Screen
Hanging Mount Instructions (Requires optional eye bolts)
See photo showing a side view using the brackets for
hanging, two hanging rings are optional; attach the
brackets to the canister as per point 6 in instructions.
Please ensure the hanging points are secured to a
suitable structure.
Ensure that the screen is free to descend and that any adhesive tape that has been placed on the
bottom of the screen (to stop movement during transport) has been removed.
When installed, the opening in the canister should be down and at the back of the canister. This will put
the motor on the left-hand side of the screen, as viewed by the audience.
Cleaning of the screen is best achieved by first dusting the surface with a feather duster, then to remove
any stubborn marks, use a small amount of mild detergent and warm water on a clean white lint free
cloth. Do not use a saturated cloth, as this may leave a watermark, only a damp one. It is most
important that you only treat the actual mark by this process and not the entire surface.
 The Motor is 240 V 50Hz and draws 1.2 A.
 The screen drop is set and tested at the factory. Therefore, any damage caused to the screen from limit
re-adjustment is not covered by warranty.
HANGING MOUNT INSTRUCTIONS
(Requires optional eye bolts)
See photo showing a side view using the brackets for hanging, two hanging rings are optional;
attach the brackets to the canister as per point 6 in instructions.
Please ensure the hanging points are secured to a suitable structure.
Please follow these instructions to ensure trouble free operation;
Ensure that the screen is free to descend and that any adhesive tape that has been placed
at the bottom of the screen (to stop movement during transport) has been fully removed.
When installed, the opening in the canister should be down and at the back of the canister.
This will put the chain drive on the left-hand side of the screen, as viewed by the audience.
Please follow these instructions to ensure trouble free operation;
(Unless ordered otherwise).
Cleaning of the screen is best achieved by first dusting the surface with a feather duster,
then to remove any stubborn marks, use a small amount of mild detergent and warm water
on a clean white lint free cloth. Do not use a saturated cloth, as this may leave a watermark,
only a damp one. It is most important that you only treat the actual mark by this process
and not the entire surface
The Motor is 240 V 50Hz and draws 1.2 A.
The screen drop is set and tested at the factory. Therefore, any damage caused to the
screen from limit re-adjustment is not covered by warranty.
Should you have any questions regarding the installation of our projection screens please call
our technical sales desk on +61 2 4869 2100 for assistance.