Training Programme Instructions; Dismantling / Recycling - GEISMAR MP.12 Manual

Rail profile grinding machine
Table of Contents

Advertisement

1.4.6 – Training programme instructions
- General and specific safety instructions
- Reading the instruction handbook
- Machine field testing
- First level maintenance training
Ref. : 450100 FR
1.4.7 – Dismantling / Recycling
Recycling is a waste treatment
process (for industrial waste or
household refuse), allowing the re-
introduction,
in
a
product
production cycle, of the materials
that made up a similar product
having reached its end of life, or
manufacturing residues.
Recycling has two major ecological consequences:
- Reduction in waste volume and thus in the
pollution that this waste would cause
(some materials take decades and even
centuries to decompose)
- Preservation of natural resources as the
recycled material is used in the stead of the
material that should have been extracted.
- The GEISMAR product must be
recycled
This operation can only be carried
out by a company or by companies
competent in the recycling of
industrial waste, and conducted as
per applicable regulations.
P a g e
| 15

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for GEISMAR MP.12

Table of Contents