Putting The Cm Lon Into Operation; Step-By-Step - Siemens Cm-lon 6BK1700-0BA10-0AA00 Manual

Logo! expansion module cm lon
Table of Contents

Advertisement

CM LON
LOGO! Expansion Module
3.

Putting the CM LON into operation

A LONMARK certified application was loaded into the CM
LON at the factory. Other applications can – where available
– also be loaded.

3.1 Step-by-step

1. Interrupt the voltage to the LOGO!.
(The LOGO! and its modules do not have power
switches.)
2. Mount the CM LON
3. Connect the power supply to the CM LON.
4. Connect the LON bus lines to the CM LON.
5. Remove the label with the Neuron-ID from the CM LON
and stick it on the network plan at the CM LON's installed
location. (The Neuron-ID is also given as a bar code on
the label.)
6. Apply power to the LOGO! and CM LON.
6BK1 700-0BA10-0AA0
A
7. If multiple CM LONs have been installed, repeat Steps 1
to 6 for each CM LON.
12
RUN/STOP
BUS
X 2
3 4
Service
B
LON
CM LON
J31069-D1263-U002-A2-7618

Advertisement

Table of Contents
loading

Table of Contents