XL8
XL
XL
XL9
Fig. 8 Section of the UKV 20-750 and UKV 20-1000
buff er tank.
Description:
QM22
UA1-UA3
UL1
XL
XL1
XL2
XL8
XL9
XL35-XL36
XL54
6
Chapter 2 |
Construction
Vent
Temperature sensor cover
Adjustable foot
Connector pipe
Connector pipe (heating system supply)
Connector pipe (return from the heating system)
Connector pipe (supplying from the heat source)
Connector pipe (return to the heat source)
Connector pipe for mounting electric heating unit
Thermometer.
QM22
XL1
XL54
UA1
XL
UA2
XL
UA3
XL35
XL2
UL1
Fig. 9 Side view of the UKV 20-750 and UKV 20-1000
buff er tank.
Buff er tank
UKV 20- 220-1000