Nibe UKV 20-220 Installation And Operating Manual

Buffer tanks
Hide thumbs Also See for UKV 20-220:

Advertisement

29.01.2016
25617
Installati on and Operati ng Manual
Buff er tanks:
UKV
20-220
UKV
20-300
UKV
20-500
UKV
20-750
UKV
20-1000

Advertisement

Table of Contents
loading

Summary of Contents for Nibe UKV 20-220

  • Page 1 Installati on and Operati ng Manual Buff er tanks: 20-220 20-300 20-500 20-750 20-1000 29.01.2016 25617...
  • Page 2 Operation of the product by children is strictly prohibited. We reserve the right to make the product design changes and changes in the manual. ©NIBE 2016 Buffer tanks UKV 20-220/300/500/750/1000...
  • Page 3: Table Of Contents

    4.3 Thermal Insulation of the System ......9 4.4 Frost Protection ...........9 4.5 Warnings and Practical Recommendations ..10 5. SERVICE ............10 6. RECYCLING AND DISPOSAL ....... 10 7. TECHNICAL DATA ..........10 7.1 Dimensions ............11 8. WARRANTY TERMS & CONDITIONS ....14 Buffer tanks UKV 20-220/300/500/750/1000...
  • Page 4: General

    This also enhan- ces the effi ciency and life of the boiler. NIBE buff er tanks ena- ble operati on with virtually any type of central heati ng sys- tem.
  • Page 5: Design

    INSTALLATION AND OPERATING MANUAL 2. DESIGN UKV Buff er tanks by NIBE are made of high quality steel she- Buff er tanks with a capacity of 750 and 1000 litres are equip- ped with a special bar (gate) located on the left side of the et, coated on the outside with anti -corrosion paint.
  • Page 6 12. Lower tank insulati on. Temperature sensor cover. 13. Adjustable foot. Steel tank. 14. Thermometer Tank insulati on. 15. Connector pipe for mounti ng electric heati ng unit. Connector pipe (return from the heati ng system).. 16. Tank cover. Buff er tanks UKV 20-220/300/500/750/1000...
  • Page 7: Installation

    5. Remove the jacket surrounding the tank (housing jacket.) 6. Remove the four-piece thermal insulati on. Aft er the installati on of the tank in its fi nal locati on, reinstall the removed components in the reverse order. Fig. 11 Housing disassembly Buff er tanks UKV 20-220/300/500/750/1000...
  • Page 8: Installation Requirements

    Safety valve drain line should be installed with a decline, in an Expansion vessel environment free of freezing and remain open to the atmos- phere. NIBE is not responsible for fl ooding the room through Informati on the safety valve.
  • Page 9: Connection And Start-Up

    Vent the tank and the C/H sys- tem aft er fi lling them. Vent the unit through the vent installed in the top head of the tank (see Fig. 14.) Fig. 14 Venti ng the buff er tank Buff er tanks UKV 20-220/300/500/750/1000...
  • Page 10: Warnings And Practical Recommendations

    14 day. 6. RECYCLING AND DISPOSAL Practical Recommendations: According to the NIBE rules, the products have been manufac- tured of high quality materials using the latest technologies • Limit the setpoints of the heating medium temperature and solutions that do not endanger the environment.
  • Page 11: Dimensions

    INSTALLATION AND OPERATING MANUAL 7.1 Dimensions Fig. 15 Dimensions of the UKV 20-220 buff er tanks Fig. 16 Dimensions of the UKV 20-300, 20-500 buff er tanks Buff er tanks UKV 20-220/300/500/750/1000...
  • Page 12 Supply of the heati ng system inch 1 ½” female M Thermometer enclosure ø10 female N Vent inch ¾” female Table 2.Connector pipe diameters in the UKV 20-220, 20-300, 20-500 buff er tanks. Dimensions UKV 20-220 UKV 20-300 UKV 20-500 1336 1253 1400...
  • Page 13 1428 N Vent inch ¾” female 1773 1828 2010 2078 Table 4.Connector pipe diameters in the UKV 20-750, 20-1000 buff er tanks. 21 -0/+15 Table 5. Dimensions of the UKV 20-750, 20-1000 buff er tanks. Buff er tanks UKV 20-220/300/500/750/1000...
  • Page 14: Warranty Terms & Conditions

    NOTES NOTES: Buffer tanks UKV 20-220/300/500/750/1000...
  • Page 16 NIBE Energy Systems France Sarl, Zone industrielle RD 28, Rue du Pou du Ciel, 01600 Reyrieux Tel : 04 74 00 92 92 Fax : 04 74 00 42 00 E-mail: info@nibe.fr www.nibe.fr NIBE Energy Systems Ltd, 3C Broom Business Park, BridgeWay, Chesterfield S41 9QG Tel: 0845 095 1200 Fax: 0845 095 1201 E-mail: info@nibe.co.uk www.nibe.co.uk...

This manual is also suitable for:

Ukv 20-300Ukv 20-750Ukv 20-1000Ukv 20-500

Table of Contents