Page 1
Liebert® NXL™ UPS Installation Manual 500 kVA – 750 kVA, 0.9 PF, 60 Hz, Three-phase, Single-module and Mulit-module...
Page 2
The products covered by this instruction manual are manufactured and/or sold by Vertiv This document is the property of Vertiv and contains confidential and proprietary information owned by Vertiv. Any copying, use or disclosure of it without the written permission of Vertiv is strictly prohibited.
Read all of the following instructions before attempting to move, lift, or remove packaging from unit, or prepare unit for installation. Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
Page 8
Operation of this unit in a residential area may cause harmful interference that the user must correct at his own expense. Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
UPS. • Verify that the UPS room satisfies the environmental conditions stipulated in the equipment specification, paying particular attention to the ambient temperature and air exchange system. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
NOTE The UPS must be placed a solid surface. There must be no openings in the surface except those required for conduit landing areas. All provided kick plates must be installed. Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
Kick plates must be installed. If the unit is to be installed in a position that does not permit access to rear kick plates, then the kick plates must be installed before the unit is placed in its final position. Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
When bringing the 1+N system on-line for the first time or after removing one unit, Vertiv recommends checking the bypass current mismatch. To check the bypass current mismatch: Place a load on the bypass of each UPS module.
Check that these supplies are electrically isolated, and post any necessary warning signs to prevent their inadvertent operation. When sizing battery cables, a maximum volt drop of 2VDC is permissible at the current ratings given in Table 17. Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
DRAWINGS). The grounding conductor must be connected to the ground busbar and bonded to each cabinet in the system. All cabinets and cabling should be grounded in accordance with local regulations. NOTE Proper grounding reduces problems in systems caused by electromagnetic interference. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
All operations described in this section must be performed by properly trained and qualified electricians or technical personnel. If any difficulties are encountered, contact Vertiv. See the back page of this manual for contact information. The grounding and neutral bonding arrangement must be in accordance with local and national codes of practice.
REPO Switch, common contact (150m) Key status switch, closed = key removed 14AWG/500 Key Status Input TB082 Key status switch, common Form C (150m) Key status switch, closed = key inserted Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 20
For 1+N systems with a maintenance Bypass, these auxiliary contacts must be run to each module from an isolated source. 2. For 1+N systems, these breaker Aux contacts go to the UPS that they are associated with. Key Status Input can be either Form-C, N.O. or N.C. contact Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
Ground - Drain Wire P3101-14 P3101-14 Ground P3101-8 P3101-8 PWM synch CAN +24V P3101-9 P3101-9 PWM synch CAN common P3101-10 P3101-10 MMS synch CAN +24V P3101-11 P3101-11 MMS synch CAN common Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 22
8. Attach control wires to side of control door where Inter-Module Board (IMC) is attached. Do not run wires across IMC board. Figure 7 Inter-Module Communication Board wiring diagram—Multi-modules P3103 P3103 P3103 02-806730-xx 02-806730-xx 02-806730-xx P3101 P3101 P3101 UPS 3 UPS 1 UPS 2 Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
1_CB1_COM Contacts Fuses should be 10A class CC or J type time delay Electrical operator power provided by switchgear fuse vendor and shall be powered from line side of RIB Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
IOB must be Listed UL 489 (Molded Case Circuit Breaker) or UL 1066 (Low Voltage AC Power Circuit Breaker) that are required to be used in UL-listed switchgear or switchboards. The circuit breaker must have a short-time rating not exceeding 480 Volts at 150K Amperes, for 5 cycles. Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
Remote IOB contacts from remote breaker to UPS IOB CB interface board TB1-1 Voltage sense PH A Remote Breaker #14AWG/ TB1-2 Voltage sense PH B Voltage Sense 500ft. (300m) TB1-3 Voltage sense PH C Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
6. Attach the control wire to the side of control door where the Inter-Module Board (IMC) is attached. Do not run the wire across IMC board. Figure 10 Inter-Module Communication Board wiring diagram—Digital LBS P3108 P3108 P3108 02-806730-xx 02-806730-xx 02-806730-xx P3109 P3109 P3109 UPS 3 UPS 1 UPS 2 Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
0.2 seconds to prevent tripping when the UPS performs a transfer or retransfer. NOTICE Risk of improperly set ground fault interrupters. Can cause equipment damage. Failure to set the ground fault interrupters properly could cause loss of power to the critical load. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
2.6.5 High Resistance Ground Systems ® ™ ™ The Liebert is compatible with high resistance ground systems. See your local Vertiv representative for details. Grounding Diagrams, Single- and Multi-Module Systems Figure 11 Grounding diagram, three-wire single-module system Source BPSS...
Page 29
Figure 12 Grounding diagram, four-wire single-module system Source BPSS Figure 13 Grounding diagram, three-wire multi-module system Switchgear UPS #1 Source UPS #2 UPS #3 Grounding for 1+N systems is wired Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Matching Maintenance Bypass Cabinet ® ™ A matching Liebert Maintenance Bypass cabinet is available. See Maintenance Bypass Cabinet installation manual (SL-24532), available at Vertiv’s Web site: www.vertivco.com ) for details. 3.1.2 Battery Temperature Sensor The optional external battery temperature sensor kit, supplied separately from the battery circuit breaker, contains one probe and one temperature transport board.
All control wiring (by others) must be run separate from power wiring. Control wiring runs should not be combined in the same conduit. Signal voltage: 100mA @ 12VDC. Maximum cable length 500 ft. (152m) with #16AWG and flexible Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
6. All wiring is to be in accordance with national and local electrical codes. Front-Most 7. Depth dimension includes front door and rear panel. Edge of Frame 8. Width dimensions include side panels. Subtract 1.4" (35mm) when DETAIL B removing both side panels. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
1. Control wiring and power wiring must be run in separate conduits 2. All wiring is to be in accordance with national and local electrical codes. U40-5E-3200 Rev. 4 3. See page 2 of 2, Drawing Number: U40-5E-3201. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
1.All dimensions are in inches (mm). 2. Unless otherwise noted, use copper or aluminum conductors suitable for at least 75°C. 3. All wiring is to be in accordance with national and local electrical codes. Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
Page 41
PILLARS REMOVED (PART A) (PART B) FOR CLARITY NOTES: 1. All dimensions are in inches (mm). 2. Unit bottom is structurally adequate for forklift handling. 8.0 [202] BOTTOM OUTPUT (PART B) Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 42
02-806704 Inverter Gate Drive B UPSC ID: P0400B 604309G To: 02-806701 02-806704 Inverter Gate Drive C UPSC ID: P0400C 02-806708 To: 02-806708 604325G1 DCFAN_2 & DCFAP_1 DC Fuse Block External Interface Board ID: P0814 Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 43
(-) DC BUSBAR M10 HEX HEAD BOLT HARDWARE PROVIDED WITH PART A. (4) BOLTS TOTAL. TORQUE CONNECTION TO 27 N-M, 240 IN-LB. DETAIL B DC POWER CONNECTION BETWEEN PART B AND A. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 44
External Interface Board ID: P55 02-806710 02-806716 To: 02-806716 ID: 604352G1 Fan Interface Board#1 AC Power Distribution Board P1011A 02-806710 02-806710 To: 02-806710 604348G1 Fan Interface Board#1 FAN Interface Board#2 ID: P99 Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
3. Keep cabinet within 15 degrees of vertical. 4. Top and bottom cable entry available through removable access plates. Remove, punch to suit conduit size and replace. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 48
® ™ Figure 29 Outline Drawing, 625/750kVA Liebert , SMS and 1+N multi-module unit with static bypass Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 49
(Part B) 2. Unit bottom is structurally adequate for forklift handling. 8.0 (203.2) 6.0 (152.4) Bottom Input (Part A) Bottom Output (Part B) Bottom Cable Entry Panels Pillars Removed For Clarity Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 50
® ™ Figure 31 Base Drawing, 625/750kVA Liebert , SMS and 1+N multi-module unit with static bypass Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 51
DUAL LUG CONNECTION DETAIL Do not double-stack lugs (two lugs on same side of busbar). This is to prevent the cables from coming into contact with other busbars. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 52
2. Control wiring and power wiring must be run in separate conduits. 3. Unless otherwise noted, use copper or aluminum conductors suitable for at least 75°C. 4. All wiring is to be in accordance with national and local electrical codes Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
Page 53
DO NOT DOUBLE-STACK LUGS 3. Unless otherwise noted, use copper or aluminum conductors suitable for at least 75°C. 4. All wiring is to be in accordance with national and local electrical codes. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
BYPASS / OUTPUT NEUTRAL REMOVED FOR CLARITY RIGHT FRONT (PART B) RIGHT SIDE (PART B) .56 DIA.(14) Typ. 1.30 (33) Typ. 28 PLACES DO NOT DOUBLE-STACK LUGS 1.75 OUTPUT GROUND (44) Typ. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 55
To: 02-806704-Phase C 531985G3 UPSC (Control Door) 02-806704 - Inverter Gate Drive C ID: P0400C To: 02-806716-__ 532061G1 Power Supply 02-806716 - AC Distribution Board Connection ID: P1305 WH P/N: 532061G1 Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 61
Reuse hardware to mount ground plate Bolt and Washer Bolt DETAIL B COMPLETE ASSEMBLY M6 hardware for Ground Plate Washer provided in shipped-loose bag inside Wire Cabinet Bolt and Washer Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
Page 62
2. Install Phase B busbar as shown in Figure 41. Install Phase B cables. 4. Install Phase A busbar as shown in Figure 41. Install Phase A cables. 6. Verify that all busbar bolt connections are torque properly. Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
The UPS will operate at full load, but the battery charge will either be reduced or Off (depending on input current). 2. The UPS will operate at full load, but UPS may source share with the batteries (depending on input current). UPS will be in Battery mode Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...
Width dimensions are with side panels attached. Subtract 1.4" (35mm) for dimensions without side panels. 2. Depth dimensions include the front door and rear panel. Table 14 Current ratings—rectifier input UPS Rating Voltage Nominal Maximum Current Current 562.5 1219 1018 Vertiv | Liebert 500-750kVA UPS Installation Manual | ® ™...
2. Maximum input current is controlled by the current limit setting, which is adjustable. Values shown are for maximum current limit. If a smaller input feed breaker is used, the input current limit can be adjusted. Contact your Vertiv representative for more information. ®...
Page 69
2. For continuous operations not at 86°F (30°C), recommend that the site planner choose the appropriate cable type based on the particular installation requirements. Conduit size is based on FMC type conduit with two neutral conductors rated at 200% of phase. Vertiv | Liebert 500-750kVA UPS Installation Manual | ®...