System Maintenance; Tightening Torques - ABB TruFit User Manual

Power distribution unit 50-300 kva
Table of Contents

Advertisement

7 System maintenance

Minimal periodic maintenance of the unit is required. As with all electrical distribution components, this
system should be regularly inspected for electrical connection integrity, signs of excessive temperature,
accumulation of dirt, and proper system operation.
As with any electronic devices, critical circuits are subject to normal life cycle effects. ABB offers various
service plan levels to keep your equipment in peak operating condition as the unit ages. Contact ABB
Service Sales at ric_servicesales@ us.abb.com or go to https://new.abb.com/ups/service-ups-and-power-
conditioning to learn more.
7.1

Tightening torques

Recommended tightening torque for all nuts and bolts is listed in the table below. As applicable, torque
seal has been utilized to indicate bolt torqueing.
Table 7-1: Recommended tightening torque
All internal bolts are SAE Grade 5.
Note bolt head markings above to distinguish between grades.
All internal machine screws are Grade 2.
72 94-1100-00002874 A0 EN│TruFit™ Power Distribution Unit
Only qualified service personnel should perform maintenance on the PDU.
Exercise extreme care to avoid equipment damage or injury to personnel.
Lethal voltages exist inside the unit during normal operation.
Thread
Size
Inch
1/4
5/16
3/8
1/2
SAE Grade 5
120,000 psi
Medium Carbon Heat T.
Lb-ft
6
11
20
48
N-M
8
15
27
65

Advertisement

Table of Contents
loading

Table of Contents