Implement Pre-Operation Inspection/Service - Bush Hog 3PBS1 Operator's Manual

Bale spears
Table of Contents

Advertisement

7.2 Implement Pre-Operation Inspection/Service

Before each implement use, a complete inspection and service is required to ensure the implement is in a
good and safe working condition.
immediately. To ensure the implement is ready for operation, conduct the following. OPS-T-0002
The operator's manual and safety signs affixed on
the unit contain important instructions on the safe
and proper use of the equipment. Maintain these
important safety features on the implement in good
condition to ensure the information is available to
the operator at all times.
Ensure the manual canister is secured to the
equipment with the operator's manual inside.
Ensure all safety signs are in place and legible.
Replace missing, damaged, and
decals. OPS-U- 0011
3PBS1-3PBS2 10/20
© 2020 Alamo Group Inc.
OPERATION
Damaged and/or broken parts should be repaired and/or replaced
illegible
Operation Section 4-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

3pbs2

Table of Contents