Advertisement

QUICK MILL
VETRANO 2B EVO
INSTRUCTION MANUAL
CHRIS' COFFEE SERVICE | For support email service@chriscoffee.com or call 518.452.5995.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Vetrano 2B Evo and is the answer not in the manual?

Questions and answers

Summary of Contents for Quick MILL Vetrano 2B Evo

  • Page 1 QUICK MILL VETRANO 2B EVO INSTRUCTION MANUAL CHRIS’ COFFEE SERVICE | For support email service@chriscoffee.com or call 518.452.5995.
  • Page 2 15 16 01. Reservoir hindged door 10. Portafilter 02. Cup warmer tray 11. Brew/Cam Lever 03. Steam Knob 12. Steam Pressure Gauge 04. PID 13. Brew Pressure Gauge 05. Hot Water Knob ( Do not remove more than 6oz. Of water at 1 time, this could 14.
  • Page 3 18 19 DIRECT PLUMBING THE VETRANO 2B EVO 17. Drip Tray (09) Drain 01. Switch 18 & 20 to ‘I’ 18. Water Source Switch 02. Attach the included braided water line’s angled end to 21 This switch is for low-water alarm & solenoid power.
  • Page 4 If your machine was requested in 15A instead of 20A, please attach the included convertor cord to the built-in cord on the Vetrano 2B Evo. This converter cord can be found in your separate accessory box. Only use the converter cord in 15A mode, failure to adhere to this voids warranty and could cause fire.
  • Page 5: First Time Setup

    FIRST TIME SET-UP STEP 01 Make sure your Vetrano 2B Evo’s power switches (14) are both in the off/left position. The indicator lights (15) will be unlit. STEP 02 RESERVOIR If using reservoir: Access the reservoir by lifting the hinged door (01) on the back of the machine.
  • Page 6: Normal Operation

    NORMAL OPERATION GAUGES The Vetrano 2B Evo has a dual manometer. There is one gauge that displays the brew and steam boiler pressure. STEAM PRESSURE The top needle (12) reflects the steam boiler pressure. After turning the machine on it will take approximately 15 minutes before the gauge will show any pressure.
  • Page 7 BREW PRESSURE STEP 01 The Vetrano 2B Evo has a dual manometer (12/13). There is one gauge that displays the brew and steam boiler pressure. We will be referring to the bottom needle (13) for your brew pressure. For an accurate reading, insert the backflush disk in place of the insert basket into the portafilter.
  • Page 8: Energy Savings

    SETTING ECONOMY MODE 01. Turn off your Vetrano 2B Evo off (14). 02. Hold both PID (04) buttons in and simultaneously turn the Vetrano 2B Evo on (14) until F.01 appears on the LCD screen. 03. Release the right PID button. Now, click the left PID button until nrG appears on the screen.
  • Page 9: Pid Controller

    (by default) is displaying the coffee boiler temperature. SETTING TEMPERATURE OF THE COFFEE BOILER 01. Turn on your Vetrano 2B Evo and press both the left and right PID buttons simultaneously until the display reads T1, then release both the left and right PID buttons.
  • Page 10: Regular Maintenance

    REGULAR MAINTENANCE If you need to take your E61 group apart to E61 EXPLODED VIEW lubricate it or replace a part, here is an excellent exploded view of all of its parts, how it comes CLICK HERE TO VIEW apart and how it goes back together. Regular backflushing is a vital part of any ma- BACKFLUSHING 101 chine’s maintenance schedule.
  • Page 11 CHRISCOFFEE.COM 518.452.5995 SERVICE@CHRISCOFFEE.COM...

This manual is also suitable for:

Vetrano 2b

Table of Contents

Save PDF