First Time Setup - Quick MILL Vetrano 2B Evo Instruction Manual

Table of Contents

Advertisement

FIRST TIME SET-UP
STEP 01
Make sure your Vetrano 2B Evo's power switches (14) are both in the off/left position. The
indicator lights (15) will be unlit.
STEP 02
RESERVOIR
If using reservoir: Access the reservoir by lifting the hinged door (01) on the back of the
machine. Fill to the max fill line in the reservoir and reseat until the low water alarm ceases
sounding.
DIRECT PLUMB
If you haven't already, follow the directions on page 03.
STEP 03
With your Vetrano 2B Evo plugged in and your water source prepared plug the machine into
a GFI outlet (recommended but not required). Turn the coffee boiler switch (14, Top) on, if you
plan on using the steam wand (03) or the hot water wand (05) turn on the steam boiler swith
(14, bottom) on. You should see a green light illuminate (15) next to each switch in the on
position.
STEP 04
Install your portafilter of choice, either the double or single-spouted portafilter (10), into the
group (07). At this point you should see that the heating indicator light(s) (16) for each boil-
er should be illuminated. The machine should reach the appropriate temperature in about 15
minutes, but to make delicious espresso it's necessary to allow the machine to fully heat for 30
minutes with the portafilter (10) engaged in the group (07).
For support email service@chriscoffee.com or call 518.452.5995.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vetrano 2b

Table of Contents