Installation - Netafim SandStorm Installation Manual

Metal double-chamber media filter, 20", 24" tanks
Hide thumbs Also See for SandStorm:
Table of Contents

Advertisement

INSTALLATION

This chapter describes the generic installation process of a SandStorm™ filtration system. The installation
should be carried out in line with the installation drawings supplied with the system.
1. Align the gravel tanks on the platform according to the dimensions in the table.
Distance between tanks - center to center (a)
Tank size
20"
24"
ATTENTION
To enable the connection of the manifolds,
position all the tanks with the intlet
exactly to the front.
2. Connect a nipple to each tank inlet.
8 SANDSTORM
DOUBLE-CHAMBER INSTALLATION MANUAL
cm
60
80
a
*The distances in this table are for straight-
line systems. For the distance between
inch
adjacent rows of tanks in other system
23.62
configurations, see the installation drawings
31.50
supplied with the system.
1
pointing
a
a
1
a

Advertisement

Table of Contents
loading

Table of Contents