PDU8000 Modular Precision PDC V2.0
User Manual
Figure 5-48 Connecting the fire linkage cables (scenario 2)
Step 8 Reinstall the transparent covers of the input copper bar and N bar.
Step 9 Seal the gap between cables and the cabinet using flake sealing putty. (Remove
the paper protective film from the sealing putty and use the aluminum foil film
together with the sealing putty.)
Figure 5-49 Fill the holes with flake sealing putty
----End
Issue 04 (2021-04-13)
Copyright © Huawei Technologies Co., Ltd.
5 Installation Guide
67