PDU8000 Modular Precision PDC V2.0
User Manual
Figure 5-37 Connecting the fire linkage cables (scenario 1)
Figure 5-38 Connecting the fire linkage cables (scenario 2)
Step 9 Cut cable inlet and outlet holes in the rodent-proof meshes based on the number
and size of cables to be routed.
Figure 5-39 Cutting holes in the rodent-proof meshes
Step 10 Reinstall the rodent-proof meshes.
Step 11 Reinstall the transparent covers of the input copper bar and N bar.
Step 12 Seal the gap between cables and the cabinet using flake sealing putty. (Remove
the paper protective film from the sealing putty and use the aluminum foil film
together with the sealing putty.)
Issue 04 (2021-04-13)
Copyright © Huawei Technologies Co., Ltd.
5 Installation Guide
60