Table of contents: page Boiler use and advantages........................3 Boiler VIADRUS G 350 technical data ....................4 Description............................... 6 Boiler construction..........................6 Positioning and installation........................8 Boiler standing in boiler room......................8 Directives and regulations........................9 Order, delivery and assembly........................ 10 Order ..............................
Dear customer, we thank you that you decided to purchase VIADRUS G 350 boiler thus showing your confidence in company of ŽDB GROUP a.s., VIADRUS division. For you to get used to operating your new product correctly from the start please read carefully this manual instructing you how to use the product (first of all chapter No.7 –...
Description Boiler construction The boiler body consists of sections assembled by means of forced-on insertions and is secured by anchor bolts. Boiler has a three-draught construction and the sections create the combustion space and the convection part, inside then the boiler water space. The tightness of boiler gas combustion space is guaranteed by boiler cement applied to sections seating faces and to circumference of individual section joints.
Page 7
Electric wiring diagram BOILER REGULATION Fig. no. 2 Electric wiring diagram for VIADRUS G 350...
Positioning and installation Boiler standing in boiler room The boiler is designed for positioning in closed areas with aggressiveness degree between a little up moderately aggressive terms electrotechnic regulations in a common environment (ČSN 33 2000–7–701). It agrees with the use in rooms separated from housing room itself (Declaration 91/93 Coll.., ČSN 07 0703 - Boiler room with gas fuel –...
In case that the water hardness is unsuitable it must be adjusted. Not even heating the water with higher hardness several times will prevent the soils precipitation on the boiler body walls. Precipitation of 1 mm calcite at a given point will reduce the passage of heat from metal to water by 10 %. During the heating season it is necessary to keep a constant heating water volume in the heating system and be particular about venting the heating system.
EN 60079-14 ed.2 Electrical apparatus for explosive gas atmospheres – Part 14: Electrical installations in hazardous areas (other than mines) EN 60 335-1 ed.2 Household and similar electrical appliances – Safety – Part 1: General requirements. EN 60 335-2-102 Household and similar electrical appliances – Safety – Part 2-102: Particular requirements for gas, oil and solid-fuel burning appliances having electrical connections.
Page 11
Put the inserts painted with oil or boiled –oil paint into insert openings and tap by means of a wooden • mallet. The insert must be properly and evenly inserted. Apply a sufficient layer of cement boiler on contact ground surfaces of ribs. •...
5.3.2 Pressuring the boiler body Seal the bottom hole of the front section with stopper G 2. • Seal the upper hole of the front section with stopper G 2" with bore 1/2". • Seal all threaded joints with hemp. •...
5.3.7 Installation of shell Electric panel Rear part of shell upper Front part of shell Side part of shell Upper part of shell Rear part of shell lower Washer 5,3 Spring clip 10 Screw M5 x 10 11 Screw ST 4,2 x 9,5 12 Connecting stud Fig.
Commissioning Putting the boiler into operation, setting the heat output and any intervention into the electrical part of boiler or connection of further control elements can only be done by service organization authorized to do the service works and an authorized firm for servicing the burner being operated. 1.
If the equithermal regulation is required then the Operation and installation manual is a part of delivery. Electric panel with power module Running hours counter grade I Main switch Running hours counter grade II Signalling safety thermostat and burner Unlocking of the safety thermostat failure Service thermostat Blind flange...
ŽDB GROUP a.s., the boilers manufacturer, VIADRUS division, otherwise the boiler proper function guarantee doesn’t apply. “VIADRUS G 350 boiler quality and completeness certificate “after having been filled in by contractual service organization serves as the “Guarantee certificate“.
“ and ČSN 38 6405, EN 1775 to inspect regularly the boiler. The inspections can only be done by an authorized organization (contractual service), accredited by ŽDB GROUP a.s., VIADRUS division and the manufacturer of the burner being operated.
Page 19
Information for customer Packaging edentification Assessment reference PE Plastic sacks, folie, corrugaled board, iron and plastic fix line Identification od principál materials used. Paper, Polyethylene, iron, wood Part 1: Summary of assessment Standard/Report Assessment requirement Claim Note 1.1 Prevention by source reduction 1.2 Heavy metals and ensure below maximum permitted...
Need help?
Do you have a question about the G 350 and is the answer not in the manual?
Questions and answers