Table of contents: page Purchase order and accessories .......................3 Purchase order ..........................3 Delivery a accessories ........................3 Boiler usage and advantages ........................4 Boiler technical data ...........................4 Description ..............................6 Boiler construction ..........................6 The boiler assembly ..........................6 Regulation ..............................9 Control, security and regulating elements..................9 Electrical diagrams .........................
Delivery a accessories Delivery VIADRUS G 90 boiler is delivered on a pallet equipped with a cardboard package and as a standard in a composed state equipped only with a network module. At request a delivery in a decomposed state is possible.
Boiler usage and advantages Cast-iron sectional gas boiler VIADRUS G 90 is equipped with law-emission atmospheric burner and is intended for burning pf low-pressure natural gas. The boiler is made in B design it means it is equipped 11BS with combustion gases reflux fuse. It is suitable first of all for heating the middle–sized and bigger premises.
Page 5
Tab. no. 2 Thermal parameters of boiler (heating value 33,99 MJ. m , gas temperature 15°C and bar. air pressure 1013,25 mbar) Number of sections Rated thermal output max. Rated thermal output min. Rated thermal output max Rated thermal output min Volume gas flow at the maximum thermal output 7,16 9,25...
Description Boiler construction The main boiler segment is the iron-cast sectional boiler drum made of grey cast-iron in compliance with: EN 1561 cast-iron 200 The pressure segments of the boiler conform to the strength requirements in compliance with: EN 656 Gas –...
Page 7
Gas inlet Number of sections L [mm] 1155 1315 1555 L1 [mm] 1135 1375 A [mm] 878,5 D [mm] Fig. no. 2 The main dimensions of the boiler...
Regulation Control, security and regulating elements. As a standard the boiler is delivered without the supreme regulation and is equipped with a control panel incl. a network module. The manufacturer doesn’t recommend to operate the boilers without the supreme regulation. The standard version (without the regulation) is designed for the customers who have their own boiler control system.
Page 10
A1 – RVA 43. 222 EQUITHERM REGULATOR is a boiler and heating circuit regulator for a double stage burner incl. the possibility to prepare HWS (hot supply water), with a pump heating circuit (without the mixing valve). Other regulator characteristics are as follows: •...
Page 11
The boiler by customer´s request can be equipped with the security gas fitting: 1. VALVES FOR BOILER with 8-sections - HONEYWELL VR 4601 QB 2001 WITH HIGH – LOW REEL (COIL) and a smooth start with an output at the pilot burner 2.
Page 12
3. DUNGS MB-ZRDLE 412, A TWO-STAGE ELECTROMAGNETIC VALVE FOR BOILER WITH 10,12 and 15 SECTIONS The main security is Dungs MB-ZRDLE 412, a two-stage electromagnetic valve which works in the regime of a nominal/ reduced heat output and enables to mount a watcher of gas fitting tightness that watches the tightness of gas valve seats.
Electrical diagrams Fig. no. 7 Elementary wiring diagram of VIADRUS G 90 – 8 sectional boiler for Honeywell version At VIADRUS G 90 version – 8 sections there isn’t used the tightness watching system at SP2 gas fitting...
Page 14
Burner Fig. no. 8a) Wiring diagram of 8 sectional VIADRUS G 90 boiler for Honeywell version...
Page 15
Panel console Fig. no. 8b) Wiring diagram of 8 sectional VIADRUS G 90 boiler for Honeywell version...
Page 16
Fig. no. 9 Elementary wiring diagram of VIADRUS G 90 – 10, 12, 15 sectional boiler for Honeywell version...
Page 17
Burner Fig. no. 10a) Wiring diagram of 10, 12, 15 sectional VIADRUS G 90 boiler for Honeywell version...
Page 18
Panel console Fig. no. 10b) Wiring diagram of 10, 12, 15 sectional VIADRUS G 90 boiler for Honeywell version...
Page 19
Fig. no. 11 Elementary wiring diagram of VIADRUS G 90 – 10, 12, 15 sectional boiler for DUNGS version...
Page 20
Terminal plate console Burner Fig. no. 12a) Wiring diagram of 10, 12, 15 sectional VIADRUS G 90 boiler for DUNGS version...
Page 21
Panel console Fig. no. 12b) Wiring diagram of 10, 12, 15 sectional VIADRUS G 90 boiler for DUNGS version...
Positioning and installation Regulations and guidelines The boiler can only be installed by a firm holding the valid licence that applies to the installation and a maintenance of gas appliances. A project according to the valid regulations must be elaborated for the installation.
EN 60 335 – 1 ed. 2 Art. 7.12.4 positioned in a way making sure that the plug is accessible. The installation of the boiler must comply with all requirements of ČSN 06 1008 When positioning the boiler it is necessary to keep „VIADRUS G 90 boiler installation manual (delivered in a decomposed state) Boiler positioning with regard to the fire regulations: 1.
Fig. no. 13 Position in a boiler room. Connection to the hydraulic system We recommend to design the boilers together with expansion tanks incl. a membrane and the heating system must be equipped with safety valves. The expansion tank volume calculation based on the water volume in the system and the conditions for their use are stated in ČSN 06 0830.
Commissioning – instructions for a contracting service organization The boiler commissioning, setting the heat output, any interference with the boiler electric part or connection of further control elements can only be done by a contracting service organization authorized to do this activity. Checking activity before commissioning Before the boiler commissioning there must first of all be checked: heating system replenishment with water (pressure gauge check)
Setting the nominal output: 1. Put the boiler into operation. 2. For orientation measure the gas pressure on the gas distributor by using the digital manometer or the U-tube. 3. Before the setting procedure itself let for a while stabilize the operation pressure conditions at the burner. 4.
Nominal output setting: 1. Put the boiler into operation 2. For orientation measure the gas pressure on the gas distributor by using the digital manometer or the U-tube. 3. Before the setting procedure itself let for a while stabilize the operation pressure conditions at the burner. 4.
Page 28
7. 7.1. without the supreme regulation Switch off the boiler, disconnect the connector 2° on the diaphragm. Switch on again. 7.2. with the supreme regulation Switch over the boiler to the reduced output through the supreme regulation. 8. Release the locking screw. 9.
VIADRUS a.s., the boiler manufacturer, otherwise the guarantee for a proper boiler function becomes void. „The certificate of VIADRUS G 90 boiler quality and completeness“ serves as the “Certificate of warranty“ after having been filed in by the contracting service organization.
Maintenance Any interventions are only allowed to be done by contracting service organization that was trained by the manufacturer. 1. Disconnect the boiler from the electricity network. 2. Close the gas inlet to the boiler. 3. Disconnect the burner from the gas inlet (disconnect the flange from Honeywell electromagnetic valves or the gas Dungs multiblock and disconnect the screwing on the valve for gas inlet to the pilot burner).
Defects and their elimination The defects elimination is only allowed to be done by a trained contracting service organization which also is obliged to make an entry in the enclosure to the certificate of warranty. Defects elimination marked with symbol “∗ ∗ ∗ ∗ „ is allowed to be done by the user. If there occurs repeatedly the blockage of the safety thermostat or the combustion gases reflux fuse it is also necessary to call a contracting service worker.
– be documented in the supplement to the certificate of VIADRUS G 90 boiler quality and completeness. The guarantee does not apply to: Faults caused by improper assembly and improper attendance of the product and faults caused by improper maintenance see chap.
Page 34
Information for customer Packaging edentification Assessment reference PE Plastic sacks, folie, corrugaled board, iron and plastic fix line Identification od principál materials used. Paper, Polyethylene, iron, wood Part 1: Summary of assessment Standard/Report Assessment requirement Claim Note 1.1 Prevention by source reduction 1.2 Heavy metals and ensure below maximum permitted...
Need help?
Do you have a question about the G 90 and is the answer not in the manual?
Questions and answers