Viadrus G 300 Operation And Installation Manual

Hide thumbs Also See for G 300:

Advertisement

BOILER OPERATION AND INSTALLATION
MANUAL
VIADRUS G 300
Date of revision 8/2007

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the G 300 and is the answer not in the manual?

Questions and answers

Summary of Contents for Viadrus G 300

  • Page 1 BOILER OPERATION AND INSTALLATION MANUAL VIADRUS G 300 Date of revision 8/2007...
  • Page 2: Table Of Contents

    Table of contents: page 1. Boiler use and advantages............................3 2. Boiler VIADRUS G 300 technical data ......................4 3. Description................................5 3.1. Boiler construction............................5 3.2. Electrical diagrams............................6 4. Positioning and installation..........................10 4.1. Boiler standing in boiler room ........................10 4.2. Directives and regulations......................... 11 5.
  • Page 3: Boiler Use And Advantages

    Dear customer we thank you that you decided to purchase VIADRUS G 300 boiler thus showing your confidence in company of ŽDB GROUP a.s., VIADRUS Heating technique plant. For you to get used to operating your new product correctly from the start please read carefully this manual instructing you how to use the product (first of all chapter No.7 - Boiler operation by user).
  • Page 4: Boiler Viadrus G 300 Technical Data

    2. Boiler VIADRUS G 300 technical data Table No.1 Boiler thermo-technical parameters fuel efficiency : natural gas 33,99 MJ/kg furnace oil extra light (TOEL) 42,65 MJ/kg Boiler size - number of sections Rated thermal output 113,2 138,5 163,7 214,3 239,6...
  • Page 5: Description

    3. Description 3.1. Boiler construction The boiler body (Fig. No.1) consists of sections assembled by means of forced-on insertions and is secured by anchor bolts. Boiler has a three-draught construction and the sections create the combustion space and the convection part, inside then the boiler water space. The tightness of boiler gas combustion space is guaranteed by boiler cement applied to sections seating faces and to circumference of individual section joints.
  • Page 6: Electrical Diagrams

    3.2. Electrical diagrams Fig. No.2 Elementary wiring diagram for electro-panel connection...
  • Page 7 Fig. No.3/1 Electro-panel wiring diagram...
  • Page 8 COVER Fig. No.3/1 Electro-panel wiring diagram...
  • Page 9 BOILER REGULATION Fig. No.4 RZ 20 Regulation wiring diagram (OS 06)
  • Page 10: Positioning And Installation

    4. Positioning and installation 4.1. Boiler standing in boiler room The boiler is designed for positioning in closed areas with aggressiveness degree between a little up moderately aggressive and in terms of electrotechnic regulations common environment (ČSN 33 2000 – 7 –...
  • Page 11: Directives And Regulations

    Tab. No. 4 Flammability degrees of building materials and products Flammability degree of The building materials and products ranged in flammability degree building materials and ( selection of ČSN 73 0823: 1984) products A – fireproof Granite, sandstone, concretes, bricks, ceramic tiles, mortars, fire protection plasters ,…. B –flammable with difficulties akumin, izumin, heraklit, lignos, plates and a basaltic felts, plates of glass fibres ,..
  • Page 12: Order, Delivery And Assembly

    115 °C. 5.3. Assembly process The assembly process is stated in „ VIADRUS G 300 boiler assembly manual “ 6. Commissioning Putting the boiler into operation, setting the heat output and any intervention into the electrical part of boiler or connection of further control elements can only be done by service organization authorized to do the service works and an authorized firm for servicing the burner being operated.
  • Page 13: Boiler Conversion From „ Liquid Fuels" To „ Gas Fuels" And Back

    connection to the electricity network 230V/380V 50 Hz/TN-S g) connection to the chimney (the necessary chimney draught is 0,5 mbar). h) max. overpressure in combustion chamber is 2 mbar. The probe positioned on burner plate serves for overpressure measuring in combustion chamber. Setting the regulation elements: regulation thermostat stage I.
  • Page 14: Maintenance

    ŽDB GROUP a.s. Bohumín, the boilers manufacturer, Heating technique plant VIADRUS, otherwise the boiler proper function guarantee doesn’t apply. “VIADRUS G 300 boiler quality and completeness certificate “after having been filled in by contractual service organization serves as the “ Guarantee certificate“.
  • Page 15: Instructions For Product Disposal After Its Service Life

    Safety Office for ensuring the labour safety in law-pressure boiler rooms “ and ČSN 38 6405, ČSN EN 1775 to inspect regularly the boiler. The inspections can only be done by an authorized organization (contractual service), accredited by ŽDB GROUP a.s. Bohumín, VIADRUS Heating technique plant and the manufacturer of the burner being operated. –...
  • Page 17 1 – jacket front section 25 – blind flange large 2 – front section 26 – drain cock 3 – central section 27 – small valve 4 – rear section 28 – rear lower jacket part 5 – boiler insertion 29 –...
  • Page 18 Information for customer Packaging edentification Assessment reference PE Plastic sacks, folie, corrugaled board, iron and plastic fix line Identification od principál materials used. Paper, Polyethylene, iron, wood Part 1: Summary of assessment Standard/Report Assessment requirement Claim Note 1.1 Prevention by source reduction 1.2 Heavy metals and ensure below maximum permitted levels for...
  • Page 20 ŽDB GROUP a.s., závod Topenářská technika VIADRUS...

Table of Contents