Unpacking & Set Up; Unpacking - Bayer HealthCare Clinitek Status Operator's Manual

Hide thumbs Also See for Clinitek Status:
Table of Contents

Advertisement

1
Unpacking & Set Up

Unpacking

Unpacking
1
Carefully remove the contents
of the shipping carton. Check the
carton and instrument for visible
signs of damage; if seen,
immediately contact the carrier.
1
Clinitek Status
®
2
Test table
Do not touch the white
calibration bar.
3
Test table insert
If you are using a reagent strip
that has 4 or fewer test pads,
®
e.g., Uristix
4, you must use a short
test table insert. This has to be ordered
separately (for a list of suppliers see
Appendix A, Local Technical Support
Providers and Distributors).
4
Power Supply
If the power cord is not the style
you need, contact your local Bayer
office (for a list of contacts see
132387 Rev. D, 2006-06
1
5
3
analyzer
2
Remove each of the wrappings
and check for the following items:
4
2
Appendix A, Local Technical Support
Providers and Distributors).
5
Paper Roll
6
®
Clinitek Status
shown)
Do not remove the Check
Cassette from its foil packaging. The
Check Cassette should be available
if you need to call Bayer for
assistance with an analyzer error.
Store the cassette in the pocket
located inside the back cover of your
Operator's Manual.
Depending on the model you have
received, there may also be a Warranty
Registration Card, Unpacking/Setup Guide,
and/or Quick Reference Guide included.
Check Cassette (not
1-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents