York YR Manual page 3

Rotary screw liquid chillers with optiview control center for electro-mechanical starter & solid state starter
Hide thumbs Also See for YR:
Table of Contents

Advertisement

FORM 160.81-O1 (1020)
ISSUE DATE 10/05/2020
In complying with Johnson Controls' policy for contin-
uous product improvement, the information contained
in this document is subject to change without notice.
Johnson Controls makes no commitment to update
or provide current information automatically to the
manual or product owner. Updated manuals, if appli-
cable, can be obtained by contacting the nearest John-
son Controls Service office or accessing the Johnson
Controls Knowledge Exchange website at https://docs-
johnsoncontrols-uat.fluidtopics.net/chillers/home.
Revisions made to this document are indicated in the following table. These revisions are to technical information,
and any other changes in spelling, grammar, or formatting are not included.
AFFECTED PAGES
3
Conditioned Based Maintenance information added
SOLID STATE STARTER (MOD "B") – OPERATION & MAINTENANCE
INSTALLATION
OPTIVIEW™ CONTROL CENTER – SERVICE INSTRUCTIONS
WIRING DIAGRAM – UNIT WITH ELECTRO-MECHANICAL STARTER
WIRING DIAGRAM – UNIT WITH MOD "B" SOLID STATE STARTER
RENEWAL PARTS – UNIT
RENEWAL PARTS – OPTIVIEW™ CONTROL CENTER
Traditional chiller maintenance is based upon assumed
and generalized conditions. In lieu of the traditional
maintenance program, a Johnson Controls YORK
Conditioned Based Maintenance (CBM) program can
be substituted. This CBM service plan is built around
the specific needs for the chiller, operating conditions,
and annualized impact realized by the chiller. Your lo-
cal Johnson Controls Branch can propose a customized
JOHNSON CONTROLS
CHANGEABILITY OF THIS DOCUMENT
REVISION NOTES
ASSOCIATED LITERATURE
DESCRIPTION
CONDITIONED BASED MAINTENANCE
It is the responsibility of rigging, lifting, and operating/
service personnel to verify the applicability of these
documents to the equipment. If there is any question
regarding the applicability of these documents, rig-
ging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of the
equipment prior to performing any work on the chiller.
DESCRIPTION
Planned Service Agreement that leverages real time
and historical data, delivering performance reporting,
corrective actions required and data enabled guidance
for optimal operation and lifecycle assurance. The pro-
gram will include fault detection diagnostics, operation
code statistics, performance based algorithms and ad-
vance rules based rationale delivered by the Johnson
Controls Connected Equipment Portal.
FORM NO.
160.00-O2
160.81-N1
160.81-M1
160.81-PW1
160.81-PW2
160.81-RP1
160.81-RP3
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents