Installation Of The Launch Fiber Module; Installation Of The Launch Fiber Into The Module - JDS Uniphase OTU-8000 (EOTU8000E) User Manual

Optical test unit for onmsi rack-based optical test unit for rfts (remote fiber test system)
Table of Contents

Advertisement

Available languages

Available languages

Installation of the Launch Fiber Module

Installation of the Launch
Fiber into the module
The OTU-8000 can be equipped with a Launch Fiber Module, usually
set above the OTU-8000.
Fig. 34
Launch Fiber Module to place above the
NOTE
This module is used to get default visibility at the very beginning of the
fiber to test (the launch fiber is in the dead zone, not the fiber to test).
You must use a Torx Screwdriver to install the Launch Fiber into the
Module
1 Open the Launch Fiber Module by unscrewing the 4 Torx screws of
the upper cover.
Use a screwdriver to remove upper cover.
Fig. 35
Removing upper cover
2 Set the Launch Fiber reel into the box, and fix it with the screws.
Fig. 36
Installation of the Fiber Launch
User Manual
7OTU80050/01
Chapter 3 Installation of the OTU-8000

Installation of the Launch Fiber Module

Set screws for the launch fiber reel
OTU-8000
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents