Installation Of The Female Ground Connector; Installation Of Ferrites - JDS Uniphase OTU-8000 (EOTU8000E) User Manual

Optical test unit for onmsi rack-based optical test unit for rfts (remote fiber test system)
Table of Contents

Advertisement

Available languages

Available languages

Installation of the Female
Ground Connector

Installation of Ferrites

Procedure for switching on
and off the OTU-8000
NOTE
The OTU-8000 cover panel clearly states the place of each wire to
connect above the male connector.
The OTU-8000 is equipped with a male ground connector. You need a
female clip (large: 6.3 mm / width: 0.8 mm), which will be set onto the
Male Ground connector, as described in the photo below.
Female ground
Fig. 23
Female Ground Connector
The OTU is delivered with 2 ferrites to set onto the 48V supply cable:
1 Open the ferrite
2 Make 1 turn of the cables around the ferrite
3 Close the ferrite
4 Repeat the process for the second ferrite if another supply cable is
used.
Fig. 24
Ferrite and cable
As the OTU-8000 has been designed to function permanently, no
switch on and switch off buttons are offered. Nevertheless, a specific
procedure is required if you really need to switch on or off the OTU-
8000.
Switching on the OTU-8000
1 Plug the 5-pin connector.
2 Wait that the led Stand-by indicates that the switching on procedure
is completed, (about 3 min.) (see
Switching off the OTU-8000
1 Keep pressing on the button Off for about 3 seconds to place the
OTU-8000 in Stand-by
2 Wait that the led Stand-by indicates that the switching off procedure
is completed, (about 30 seconds). For LEDs description, see
description" page
18.
3 Unplug the 5-pin connector.
User Manual
7OTU80050/01
Chapter 3 Installation of the OTU-8000
connector
Male ground
connector
"LEDs description" on page
Supply installation
18).
"LEDs
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents