Installation RCP 250 ..........................15 7.1.1 Installation example with Sulzer lifting unit .................... 15 7.1.2 Guide tube installation RCP ........................16 7.1.3 Lowering of the RCP along the guide tube ................... 17 Sulzer reserves the right to alter specifications due to technical developments !
Page 3
7.1.4 Securing and positioning of the motor connection cables of the RCP ............18 Installation RW 300 ..........................19 7.2.1 Brackets RW 300 ............................20 7.2.2 Fitting of the open bracket with vertical swivelling (option) ..............20 7.2.3 Fitting of the closed bracket with vertical swivelling (option) ..............21 7.2.4 Bracket alignment on guide rail .......................21 7.2.5...
In case of doubt the entire scope of the planned application must be approved by Sulzer Pump Solutions (Kunshan) Co, Ltd. In the case of any faults arising, the Sulzer units should immediately be taken out of use and secured. The fault should be immediately rectified, or if necessary, contact your Sulzer Service Centre.
Operation of RW 300 Ex: In hazardous areas care must be taken that during switching on and operation of the unit it is submerged or under water. Other types of operation e.g. snore operation or dry running are not allowed! ATTENTION RW 300 with Ex h d IIB T4 approval is not equipped with a DI in the oil chamber.! The temperature monitoring of the RW 300 Ex has to be carried out by bimetallic temperature limiters...
Phase connection Propeller ø Protection method NOTE In all communication please state type of the unit, item and serial number. Tightening torque Tightening torque for Sulzer stainless steel screws A4-70: Thread Tightening torque 6.9 Nm 17 Nm 33 Nm 56 Nm...
Technical data The maximum noise level of the units of this series is ≤ 70 dB(A). In some types of installation it is possible that the noise level of 70 dB(A) or the measured noise level will be exceeded. ATTENTION The maximum fluid temperature for continuous operation is 40 °C / 104 °F for a submerged unit. Technical data RW 300 Propeller Motor Installation [mm]...
Dimension RCP 250 GUIDE TUBE 2" EN10255-M 24.4 10" ANSI B16.1 CLASS 125 Flange PN6 Type 11 DN250 DIN EN 1092-1 Figure 4: RCP 250 NOTE The weights of the units can be obtained from the nameplate of the unit or from the tables in Section 2.0 Technical Data.
Flange dimension check RCP 250 (mm) +0.5 ange PN6 DIN EN1092-1 Typ 11 ange Class125 ANSI B16.1-2010 Figure 5: Flange dimensions ATTENTION Before installing the recirculation pump, check the dimension of the flange. Make sure that the dimension specified in the drawing is adhered to, otherwise the flange will need to be reworked.
Safety The general and specific health and safety hints are described in detail in the separate booklet Safety Instructions for Sulzer Products Type ABS. If anything is not clear or you have any questions as to safety make certain to contact the manufacturer Sulzer. Lifting, transport and storage Lifting ATTENTION! Observe the total weight of the Sulzer units and their attached components! (see nameplate for weight of base unit).
Storage of the units ATTENTION The Sulzer products must be protected from weather influences such as UV from direct sunlight, high humidity, aggressive dust emissions, mechanical damage, frost etc. The Sulzer original packaging with the relevant transport securing devices (where used) ensures optimum protection of the unit.
Structural design RW 300 Figure 7: RW 300 Legend Bracket Mechanical seal Cable inlet Propeller boss Connection chamber Propeller Sealing of the motor chamber Shaft unit with rotor and bearings Stator SD - ring Lifting bracket with shackle Gear Stainless steel covering (option)
The electrical connection is carried out in accordance with Section 8 Electrical connection. NOTE We recommend that Sulzer installation accessories be used for the installation of the RCP recirculation pump and RW mixer. Particular attention must be paid to the safety regulations covering work in closed areas in sewage plants as well as good general technical practices.
7.1.2 Guide tube installation RCP The safety hints in the previous sections must be observed! ATTENTION The discharge line and the required flange DIN EN 1092-1 PN6 should be installed on site before starting the installation of the guide tube. The DIN-flange should be installed so that none of the holes in the flange are on the axis line but are symmetrically on either side of it.
7.1.3 Lowering of the RCP along the guide tube To ensure the RCP will tilt enough to lower correctly on the guide tube, the angle of the pump created by the lifting hook when suspended by the hoist has to be checked prior to lowering. For this purpose, begin lifting the pump from a horizontal surface and check that the rear end of the fixing support rises 20- to 40- mm from the floor before the front end begins to lift clear (see drawing below).
7.1.4 Securing and positioning of the motor connection cables of the RCP The safety hints in the previous sections must be observed! NOTE The cable holders described here are not supplied as part of the standard execution of the RCP. Figure 12: Securing and positioning of the motor connection cables of the RCP •...
Installation RW 300 We recommend that the closed bracket be used for this type of installation (see Figure 14 closed bracket). Figure 13: Installation example with existing accessories Legend Hoist with winch and rope Safety stop clamp Upper bracket with locking plate Swivelling square guide tube Closed bracket Cable clamp with cable hook...
7.2.1 Brackets RW 300 Brackets which can be swivelled vertically (only optional) are available for both open and closed models of the brackets for all mixers of the series RW 300. open closed Figure 14: Open bracket/closed bracket 7.2.2 Fitting of the open bracket with vertical swivelling (option) 8 (2x) 9 (2x) 5 (2x)
7.2.5 Vertical adjustment The tilt bracket allows for installation of the mixer at various angles on the guide rail between ±30°. This is depending on the installation/application and can be adjusted on site. Figure 18: Vertical adjustment on the guide rail Electrical connection The safety hints in the previous sections must be observed! Before commissioning an expert should check that one of the necessary electrical protective devices is avail-...
Standard connection diagram, mains voltage 380 - 420 V at 50 Hz / 460 V at 60 Hz 50 Hz 60 Hz A 15/6 A 17/6 A 28/6 A 32/6 M3 ~ Figure 19: One power cable with integrated control leads (internal connection in the motor only for motor < 3 kW) Lead designations Join U2 &...
Operation with frequency inverters The stator design and the insulation grade of the motors from Sulzer means that they suitable for usage with frequency inverters. It is however essential that the following conditions are met: • The guidelines for EMC (electromagnetic compatibility) are complied with.
CA 461 module for each sensor/input, to allow not only identification but also to prompt to the appropriate response to the alarm category/severity. Multiple-input leakage control modules are also available. Please consult with your local Sulzer representative.
0,5 B B = Tank width; H = Water depth Figure 22: Installation example with aeration ATTENTION The illustration is only an example. For the correct installation please contact Sulzer. ATTENTION Operation within the directly aerated area is not allowed! ATTENTION The units must work fully submerged in the fluid.
Checking direction of rotation When the units are being commissioned for the first time and also when used on a new site, the direction of rotation must be carefully checked by a qualified person. The direction of rotation (propeller rotation) is correct if the propeller when viewed from the rear over the motor housing rotates in a clockwise manner (see arrow). Figure 23: Checking direction of rotation When checking the direction of rotation take care that no injury can be caused by the rotation of the propeller or the resulting airflow. Do not place a hand or other part of the body near the propeller or the hydraulics! The direction of rotation should only be altered by a qualified person.
This applies particularly if the unit is continually switched off by the current overload in the control panel, by the thermal sensors/limiters of the thermo-control system or by the seal monitoring system (DI). The Sulzer service organisation would be pleased to advise you on any applications you may have and to assist you in solving your aerating problems. NOTE...
In these cases the unit should be immediately switched off and inspected. If no fault can be found or the fault remains after it has apparently been corrected the unit should be left switched off. The same applies also where the current overload in the control panel regularly trips, where the DI leakage sensor or the temperature sensors in the stator are activated. We recommend that in such cases you contact your local Sulzer Service Centre. 10.3...
Page 30
PERIOD OF TIME: Recommendation: once a year ACTIVITY: Checking of the tightening torques of the screws and nuts. DESCRIPTION: For safety reasons we recommend that all screws are checked for their perfect positioning once a year. MEASURE: Tighten screws with correct tightening torques (see Section 1.6).
Page 31
Manufacturer: Sulzer Pump Solutions (Kunshan) Co., Ltd No.8 West Chenfeng Road, Kunshan, Jiangsu Province, 215300, China Year of production: Serial no.: Type: Check before first operation: Recurring checks (at least once a year) Date Remarks Operating Signature Repaired hours on/by...
Need help?
Do you have a question about the ABS RW 300 and is the answer not in the manual?
Questions and answers