11 SERVICE WORK ON THE CHASSIS
50
–
4
Tighten screw
Guideline
Screw, top steering
head
A00804-10
–
Mount and tighten screw
Guideline
Screw, top steer-
ing stem
A00805-10
–
Using a plastic hammer, tap lightly on the upper triple clamp to
avoid stresses.
–
Tighten screws
Guideline
Screw, top triple clamp
–
Secure the wiring harness with cable holder
A00806-10
–
Position the brake caliper. Mount and tighten screws
Guideline
Screw, front
brake caliper
–
Position the brake line and the clamp. Mount and tighten
bl
screws
.
Guideline
Screw, brake line
A00885-12
bracket
Finishing work
–
Install front fender. (
–
Mount the handlebar cushion.
–
Install the start number plate. (
–
Install the front wheel.
–
Check that the wiring harness, throttle cables, and brake and clutch
lines can move freely and are routed correctly.
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
.
M20x1.5
12 Nm (8.9 lbf ft)
7
.
M8
20 Nm (14.8 lbf ft)
8
.
M8
20 Nm (14.8 lbf ft)
9
M8
25 Nm (18.4 lbf ft)
EJOT
1.7 Nm (1.25 lbf ft)
p. 53)
p. 52)
(
p. 88)
p. 51)
Loctite
®
243™
on the left.
bk
.
Loctite
®
243™
p. 44)