Three Stage Installation - ATEN Master View CS-1754 User Manual

Aten masterview cs-1754 kvm switch: user manual
Hide thumbs Also See for Master View CS-1754:
Table of Contents

Advertisement

Three Stage Installation

The procedures for setting up a three stage installation are essentially
the same as for a two stage installation. With a three stage setup, as
many as 64 (CS-1754) or 512 (CS-1758) computers can be controlled in
a complete installation. A table showing the relation between the
number of computers and the number of switches needed to control
them is provided on p. 46.
Note: Switches cannot be cascaded beyond the third level.
Once you have finished cabling up (see Two Stage Installation for
details, if necessary), power up according to the following sequence:
1. For each Third Stage unit, plug the power adapter cable into the
switch's Power Jack; plug the power adapter into an AC source.
2. For each Second Stage unit, plug the power adapter cable into the
switch's Power Jack; plug the power adapter into an AC source.
3. Plug the First Stage unit's power adapter cable into its Power Jack,
then plug the power adapter into an AC source.
4. Turn on the power to all the computers.
Note: The Power On sequence requires that all Third Stage units be
powered on first. After they are all on, the Second Stage units
must be powered on next. After all the Second Stage units are
on, the First Stage unit must be powered on. Only after all the
switches have been powered on in this sequence, can the
computers be powered on.
CS-1754 / CS-1758 User Manual
13

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Master view cs-1758

Table of Contents