Installing the applications card

Installation and commissioning of the applications card with the pre-installed
applications.
Installing the applications card
The applications card can only be fitted to slot 2. This is located at the bottom left,
below slot 1 with the CPU1 processor card for the communication server. To fit the
applications card into the communication server, proceed as follows:
1. Create a backup of the configuration data on the communication server if the
server is already in service or has already been configured.
2. Check the communication server IP environment with regard to the following:
Note:
There should be no other communication server with installed appli-
cations card on the communication server subnet.
3. Make sure that the communication server is deactivated.
4. Unscrew the screw on the larger dummy cover in slot 2 and remove the cover by
pulling the screw.
5. Remove the plastic cover of the narrow dummy cover in slot 2. To do so insert a
screwdriver at an angle from below to release the snap-in mechanism on the
plastic cover.
6. Unscrew the screw on the narrow dummy cover and remove the cover by pull-
ing the screw.
7. Carefully slide the applications card into the shaft of slot 2 and gently press the
card as far as it goes into the connection on the backplane.
8. Use the screw to secure the card in its slot.
The applications card is now installed.
Take the applications card in operation
To take the applications card in operation, proceed as follows:
1. Switch on the communication server.
Switching on the communication server also powers up the applications card.
You can see this on the the LED's On/Off key which now turns steady orange.
Applications card CPU2-S
syd-0500/1.2 – R3.0 SP1 – 04.2014