Figure 36. Recording the battery support information
®
42
IBM
TotalStorage
FAStT700 Fibre Channel Storage Server: User's Guide
For information on disposal of sealed lead acid batteries outside the United
States, contact your local waste disposal facility.
5. Prepare the new battery. Unpack the battery CRU. Save the packing material
for shipping the used battery CRU to a disposal facility.
6. Find the "Battery Support Information" label on the front of the new battery
CRU, as shown in Figure 36.
Fill in the following information:
v Date of Installation - Record today's date on the blank line
v Replacement Date - Record the expiration date (three years from today's
date) on the blank line
7. Install the new battery.
a. Using both hands, slide the battery about 5 cm (2 in.) into the slot.
b. Using the pull handles, slowly push the battery completely into the slot.
c. Tighten the four captive screws.
8. Replace the FAStT700 Storage Server bezel, as shown in Figure 21 on
page 17.
9. Run the system for at least 24 hours to properly charge the batteries. The
battery might take up to 15 minutes to complete its self-test and up to 24 hours
to fully charge, especially after a power loss of more than a few minutes.
When properly charged, both full-charge indicator lights on the front of the
battery are lit.