5.1
INSTRUCTIONS ON INTELLIGENT KEYPAD COMMANDS
On switching the unit ON, the display will show up below initialization screens.
After this, unit acquires BG automatically
This unit has been specially modified to suit the needs of the steel industry. it additionally generates audio/
visual alarms in case preset levels are exceeded.
Now user can proceed to acquisition of samples / materials.
Step wise sequence for configuration and use of the s
i.
Update BG (background radiation level)
5.2
ii.
ACQ mode selection
Select either CPS, CPM, DOSERATE, PRESET TIME, nSv/hr modes
iii.
Select time constant for dose rate mode or select preset time for PRESET TIME
mode
iv.
Enable/Disable the alarm level
v.
Acquire in the selected mode
vi.
Store acquired readings in the memory (optional)
vii.
Download stored readings to PC through USB port (optional)
5.2.1
TO UPDATE BACKGROUND
Switch ON the unit, BG gets updated automatically.
Ensure to keep the survey meter & probe about 1mtr above ground and at least 4‐5 mtrs away from any scrap &
sources.
This screen appears after switching ON the unit
At the end of 20 seconds, below screen appears indicating completion of acquisition for background
Now user can proceed to acquisition of samples / materials.
CHAPTER ‐ V
OPERATING INSTRUCTIONS
RC‐705 B
NUCLEONIX
SYSTEMS
UPDATING
BG
PLEASE
WAIT...........
NEW BG
=
µR/h
XXXX.X
for 3 Sec.
for 3 Sec.
urvey meter
Page 5 of 49
Need help?
Do you have a question about the RC 705E and is the answer not in the manual?