Hiniker 702 Operator's Manual page 17

Pickup truck snowplow
Table of Contents

Advertisement

Rotate the stop plate assembled to the push
frame up to contact the spacer bushing on
the lift cylinder bolt. Gently push back on
the upper lift frame tube, then release to
allow the weight of the frame to lock the
stop plate in place.
5.
Before assembling the power unit on the
lift frame, scrape a small amount of paint
from the two mount holes in the lift frame to
provide a good electrical ground for the turn
signals and parking lights.
Mount the power unit on the lift frame with
two 3/8" x 3/4" hex bolts and two 3/8" lock
washers. The plastic reservoir of the power
unit should be to the left side of the plow.
Locate three 90
the hardware bag.
Turn the O-ring end of one adapter into the
top port of the power unit so that it points
O
about 45
to the right and to the rear when
viewed from the top.
DWG NO. 5700
DWG NO. 6484A
O
O-ring/fl are adapters in
Turn the other two 90
A and B from the back of the power unit so
that the fl are ends point straight down.
O
Install 45
O-ring/fl are adapters into the
ports of the angling cylinders so that the
fl are ends of the adapters are directed
straight back.
Three identical hydraulic hoses are in the
parts box. Each hose has a swivel nut on
each end that will assemble to the adapters
from the power unit and three cylinders.
Connect one hose to the fi tting from the top
of the power unit, then route the hose ahead
of the lift frame tube before assembling to
the fi tting from the lift cylinder.
Connect the remaining two hoses to the
fi ttings from ports A and B at the back of the
power unit. Route both hoses ahead of the
lift frame tube before assembling the hose
from port A to the LH side angling cylinder
and the hose from port B to the RH side
angling cylinder.
Plow Assembly
15
O
adapters into ports
DWG NO. 5702A
DWG NO. 6485A

Advertisement

Table of Contents
loading

This manual is also suitable for:

752702ss752ss

Table of Contents