Download Print this page
Perrot P2S Maintenance And Operating Instructions

Perrot P2S Maintenance And Operating Instructions

Large area sprinkler

Advertisement

Maintenance and Operating Instructions 
 
Large area sprinkler 
 
Type:     P2S 
 
PERROT 
TDP057e.doc 
Rev. 22.10.2014 
Page 1 / 11 
 
Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany 
                                                                 Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133 
    E‐mail: 
perrot@perrot.de / E‐mail Technical Department: technik@perrot.de 

Advertisement

loading

Summary of Contents for Perrot P2S

  • Page 1 Maintenance and Operating Instructions    Large area sprinkler    Type:     P2S    PERROT  TDP057e.doc  Rev. 22.10.2014  Page 1 / 11    Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany                                                                   Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133      E‐mail:  perrot@perrot.de / E‐mail Technical Department: technik@perrot.de ...
  • Page 2: Table Of Contents

    4. Assembly    5. Commissioning    6. Maintenance    7. Malfunction and trouble‐shooting          1.  General    We presume, that you are experienced in the field of irrigation. Therefore we have kept  this instruction as briefly as possible, and have included such information only, which you  must have for the use of this product.    A guarantee can be accepted only, if the sprinkler has been operated in accordance with  these instructions, and if the defect occurs within the guarantee period.      1.1.  Application    The sprinkler is used for the uniform distribution of the water. The water should be  pre‐cleaned, and free of coarse and fibrous impurities.  Max. water temperature will be 50 degree C.  Max. ambient temperature will be 75 degree C.  TDP057e.doc  Rev. 22.10.2014  Page 2 / 11    Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany                                                                   Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133      E‐mail:  perrot@perrot.de / E‐mail Technical Department: technik@perrot.de ...
  • Page 3: Safety

          2.2.  Dangers if the safety instructions are not observed    Non‐observance  of  the  safety  instructions  can  endanger  persons  as  well  as  the  environment and the sprinkler. Non‐observance of the safety instructions can result  in a loss of all claims for indemnity.        2.3  Operator / Owner has to guarantee that there are no persons in  the operation area during running of the system.          Build in or erection of large area sprinkler over height of head.  If not possible the use of other safety measures has to be taken.  TDP057e.doc  Rev. 22.10.2014  Page 3 / 11    Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany                                                                   Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133      E‐mail:  perrot@perrot.de / E‐mail Technical Department: technik@perrot.de ...
  • Page 4: Description

     For  sealing  the  thread,  hemp  and  a  jointing  compound  has  to  be  used  e.g.  Fermit  special   To screw on the sprinkler, always use a pipe wrench size 3“.  Tighten the sprinkler with around 30Nm.    Do not turn the sprinkler by using the jet pipe.        S prinklers should be installed above head‐height, respectively adopt any  alternative safety measures.   Pipe wrench 3“  picture1    Screw  on  the  connection  socket  up  to  the  detent,  so  that  the  sprinkler  cannot  unscrew  itself during operation.  TDP057e.doc  Rev. 22.10.2014  Page 4 / 11    Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany                                                                   Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133      E‐mail:  perrot@perrot.de / E‐mail Technical Department: technik@perrot.de ...
  • Page 5: Commissioning

    Only  the  rotating  speed  of  the  sprinkler  has  to  be  adjusted  as  well  as  the  part  circle  operation for the sector, which has to be irrigated.       5.1  Adjustment of Rotation Speed (for agricultural applications)    Turning the regulation screw to the right will lower the rotation speed    Option:   If a “K” is stamped in the speed regulation screw, the sprinkler can be stopped   completely by turning the speed regulation screw to the right (from year of  manufacture 2013).     By turning the regulation screw to the left the rotation speed is increased.      For minimal speed, the use of clear water is required.   In case dirty water is used, the regulation screw has to be  opened completely; otherwise the sprinkler can stop its  operation.     picture 2  Adjusting screw    TDP057e.doc  Rev. 22.10.2014  Page 5 / 11    Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany                                                                   Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133      E‐mail:  perrot@perrot.de / E‐mail Technical Department: technik@perrot.de ...
  • Page 6   Setting the part circle angle    Infinitely variable by pulling (not pressing) the relevant end of the upper or lower  spring stop. The irrigated part circle has to be adjusted by the spring stops (see  sketch).     Setting part circle angle    Infinitely variable by pulling (not pressing) the relevant end of the    upper or lower spring stop.      spring stop Adjust here   picture 3      spring stop     Full circle irrigation    For full circle irrigation the spring stops have to be removed.    Only pull spring stops so far that you can slip them easily.  In case of overstretching them, they can’t be used again for  part circle operation.  TDP057e.doc  Rev. 22.10.2014  Page 6 / 11    Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany                                                                   Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133      E‐mail:  perrot@perrot.de / E‐mail Technical Department: technik@perrot.de ...
  • Page 7 Putting into service in spring    The sprinkling head of the piston drive sprinkler is, due to the load alterations and  the different installation conditions (humid, dry), exposed to extreme tensions.  Under these conditions the piston can get axial play. In order to avoid interruptions  of service, the piston cover should be tightened up at the putting into service in  spring during its first and second year of operation as described below.   The cover has to be tightened up with  the face spanner ZB98236 and an  effort of approx. 10Nm. This means at  a lever length of 10cm you have to  mobilize a strength of 100N on the  spanner.       Note:  After the 3rd and 4th winter there  shouldn’t be any more expansions.        Option: Before tightening up the grey cover,  the safety screw has to be removed.  After the adjusting of the grey cover,  the safety screw has to be screwed in  again.      The safety screw prevents an  independent loosening of the grey  cover.  TDP057e.doc  Rev. 22.10.2014  Page 7 / 11    Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany                                                                   Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133      E‐mail:  perrot@perrot.de / E‐mail Technical Department: technik@perrot.de ...
  • Page 8: Maintenance

      Stiffening ribs     Attention:  If the safety screw can’t be tightened  up, it hits a stiffening rib of the piston  drive! In this case, the grey cover has  to be pulled tighter, so that the safety  screw passes the stiffening rib.        6. Maintenance     6.1   Lubricate the thread on the steel pipe     When changing the main nozzle, the thread on the steel pipe and on the O‐ring seat  should be cleaned and lubricated.                Therefore the nozzle can be removed easily by hand and also pulled again.        O‐ring    nozzle  Jet pipe   Outlet nozzle for control water    picture 4  TDP057e.doc  Rev. 22.10.2014  Page 8 / 11    Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany                                                                   Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133      E‐mail:  perrot@perrot.de / E‐mail Technical Department: technik@perrot.de ...
  • Page 9 6.2   Clean filter for control water    The drive of the sprinkler takes place with help of a cylinder. The control water is  pre‐cleaned  by  means  of  the  filter.  The  cleaning  interval  has  to  be  fixed  in  dependence of the level of the pollution and operating time.   Please use brush and high pressure cleaner for cleaning the filter.  Filter for  control water            6.3   Clean piston drive and piston drive area    In case that the drive doesn’t function because of much dirt, the piston drive has to  be removed and cleaned.  6.3.1 Remove piston drive: (see TDP055e‐rep)  TDP057e.doc  Rev. 22.10.2014  Page 9 / 11    Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany                                                                   Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133      E‐mail:  perrot@perrot.de / E‐mail Technical Department: technik@perrot.de ...
  • Page 10: Malfunction And Trouble-Shooting

    Speed regulation is adjusted at  flushed out.  slow.  min.  Clean filter, as mentioned in  Sprinkler doesn’t rotate at  Filter is blocked.  point 6.2 and 6.3  all.  Remove nozzle. Clean jet  straightener. Take care of the  Sprinkler with bad water  Nozzle or jet straightener never  right position of the draining  jet.  is contaminated.   and run in pipes when installing  the nozzle, lubricate steel pipe  thread.  Spring stop is loose.  Sector angle gets bigger  Spring strength is lamed.   Mount new spring stop.  during operation   Spring stop is overturned.  Bearing of sprinkler is  Repair only possible by the  Groove ring is worn out  leaking.  manufacturer    Subject to change without prior notice.   TDP057e.doc  Rev. 22.10.2014  Page 10 / 11    Perrot REGNERBAU CALW GmbH     Industriestraße 19‐29  /  D‐75382 Althengstett / Germany                                                                   Phone: 0049‐7051‐162‐0 / Fax: 0049‐7051‐162–133      E‐mail:  perrot@perrot.de / E‐mail Technical Department: technik@perrot.de ...
  • Page 11                            Industriestrasse 19‐29                    75382 Althengstett – Germany                    Tel. +49‐(0)7051‐162‐0    Explains herby that the following product:      Product description:        Large area sprinkler P2S  Year of manufacture:      from 2009    Corresponds to the regulations of the guidelines designated above.      ...