Download Print this page

Bison BA870AA Instruction Manual

6” square adjustable pole system

Advertisement

Quick Links

—— Instruction Manual ——
M
Including PR98U, PR98G, PR98S and BA9885
P A R T S L I S T
Item
Qty
Description
A
1
Vertical Pole
B
Pole Cap
1
C
1
Upper Extension Arm
D
1
Lower Extension Arm
E
1
Pole Mounting Channel
F
2
Crank Mount Plate
G
1
Crank Mount Spacer Tube
H
3
3/4" X 13" Hex Bolt
I
7
3/4" Jam Lock Nut
J
1
Crank
K
1
Crank Handle
L
1
Height Gauge
M
1
Pointer
N
8
Backboard Mounting Tab
O
4
Backboard Mount Shim
P
8
Extension Arm Plug
Q
3
6" Square U-Bolt
R
6
5/8" Lock Washer
S
6
5/8" Hex Nut
The extension arm's and backboard are EXTREMELY heavy. Stay away from the area below the extension
arm/backboard while installing or adjusting. Severe injury or death may occur.
Inspect all contents prior to installation. Report any missing parts to dealer immediately.
Read all instructions before proceeding.
Date: 7/06/05 Rev: 4
For Basketball Systems Using
BA870AA
ODEL
6" Square Adjustable Pole System
B.A.
N.J.C.
Item
Qty
Description
T
1
1/2" X 5" Hex Bolt
U
6
1/2" X 1 1/4" Hex Bolt
V
7
1/2" Lock Washer
W
7
1/2" Hex Nut
X
1
5/8" X 5" Hex Bolt
Y
1
5/8" Nyloc Nut
Z
8
3/8" X 2 1/2" Hex Bolt
AA
8
3/8" Lock Washer
AB
8
3/8" Hex Nut
AC
4
3/4" X 3" Hex Bolt
AD
2
1/4" X 2 1/2" Fully Threaded Hex Bolt
AE
3
1/4" Flange Nut
AF
1
BA42G or BA42U Clear Backboard (If Applicable)
AG
1
Goal with Hardware (depending on system)
AH
1
BA870PP Pole Padding (if applicable)
AI
1
BA72U Backboard Padding (if applicable)
AJ
4
1 1/2" Thin Washer
AK
4
3/8" X 3 1/2" Hex Bolt
AL
1
PR98S Hardware (If Applicable)
AM
1
BA47 Steel Backboard (If Applicable)
Warning!!!
File: \bison server\publisher\870AA
1
Customer Service
(800) 247-7668
Ref#: 920298

Advertisement

loading

Summary of Contents for Bison BA870AA

  • Page 1 Severe injury or death may occur. ♦ Inspect all contents prior to installation. Report any missing parts to dealer immediately. ♦ Read all instructions before proceeding. Date: 7/06/05 Rev: 4 B.A. N.J.C. File: \bison server\publisher\870AA Ref#: 920298...
  • Page 2: Very Important

    Notice! If you have purchased the removable pole please follow the instructions included with the BA79UGP package to prepare hole and footing. Follow instructions #1 through #5 below for the permanent in ground pole option. Following instructions #6 through #22 will complete system installation. Locate the desired place to dig the hole for the Vertical Pole (A) taking into consideration 50"...
  • Page 3 THIS END UP YOU MUST INSTALL CRANK MOUNT PLATES (F) TO THE OUTSIDE OF BRACKET AS SHOWN. MAKE SURE THESE HOLES ARE POSITIONED AS SHOWN. ASSEMBLED VIEW Figure 2 Mount the two Crank Mount Plates (F) to the bracket on the inside of the Pole Mounting Channel (E). The plates should be positioned as shown in Figure 2.
  • Page 4 11. Intall the Upper Extension Arm (C) to the upper pivot holes in the Pole Mounting Channel (E), use the 3/4” X 1” Hex Bolt (H), 1 1/2” Thin Washers (AJ) and 3/4” Jam Lock Nut (I). Tighten completely and back off 1/2 trn as the bolt is used as a pivot and must move freely. Make sure you install the upper extension arm wth the crank pivot tubes at the top of the welded assembly.
  • Page 5 16. You should now be able to crank the extension arms up and down freely by placing the Crank Handle (K) into the crank eye and turning the handle clockwise to lower and counter clockwise to raise. If the arms do not move freely, loosen binding pivot bolts. 17.

This manual is also suitable for:

Pr98uPr98gPr98sBa9885