Transportation Of The Machine; Electrical Connections - Robland SD410 Manual

Hide thumbs Also See for SD410:
Table of Contents

Advertisement

Available languages

Available languages

Transportation of the machine

Depending on the method of transportation or shipping, you will receive the machine in a crate or on
transport blocks..
Always check if the payload of your hoist is sufficiently large. Lift the machine a few inches up and take
the bars or the bottom of the coffin away.
Make sure not to damage the frame when lifting the machine, put some cloth between the hoisting
band and the frame.
After unpacking, check that the machine for damages occurred during transport or during unloading.
Place the machine on a concrete base and level the machine horizontally in both directions.

Electrical connections

(Fig.1)
The electrical connections must be carried out by a qualified electrician.
Make sure that the mains voltage of the machine corresponds with the voltage of your workshop.
Open the junction box (fig.1) located on the frame below the entrance table and enter the connection
through the cable clamp.
Connect the three phases to terminals marked L1, L2, L3.
If the cable is equipped with a neutral ( blue) then it is connected to terminal N.
Always provide proper grounding and connect it to the terminal marked with the symbol of the earth
(the earth conductor green-yellow).
Check the rotation direction of the arbor. If it is wrong, the leads L1 and L2 must be exchanged.
The motors are protected against overload. When the engine is turned off by that security, you must
wait until the engine has cooled down before restarting the machine.
Fig.1
46
V0114 SD410 - S410
Nederlands
Français
English
Deutsch

Advertisement

Table of Contents
loading

This manual is also suitable for:

S410

Table of Contents