Download Print this page
Schacht MATCHLESS Installation And Use Manual

Schacht MATCHLESS Installation And Use Manual

Bulky plyer flyer head

Advertisement

Quick Links

MATCHLESS BULKY
PLYER FLYER HEAD
for wheels bUIlt before and after
I
nstallatIon and
Find out more at schachtspindle.com
Schacht Spindle Company 6101 Ben Place Boulder, CO 80301
p. 303.442.3212 f. 303.447.9273
© 2016 Schacht Spindle Company, Inc.
U
se
1/19/2012
06.16

Advertisement

loading
Need help?

Need help?

Do you have a question about the MATCHLESS and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Schacht MATCHLESS

  • Page 1 MATCHLESS BULKY PLYER FLYER HEAD nstallatIon and 1/19/2012 for wheels bUIlt before and after Find out more at schachtspindle.com Schacht Spindle Company 6101 Ben Place Boulder, CO 80301 p. 303.442.3212 f. 303.447.9273 © 2016 Schacht Spindle Company, Inc. 06.16...
  • Page 2 ■ scrap wood maiden is released. Do not remove the bolt from the mother-of-all. hammer (Note: on older Matchless wheels, there is an insert with the T-knob bolt. Remove the bolt; the insert stays in bolt place.) Remove the front maiden.
  • Page 3 INSTALL THE BULKY FRONT CLOCKWISE SPINNING MAIDEN Hook the spring on the Scotch ten- ■ Insert the bulky front maiden so ■ sion spring bar on the left side of the that the maiden stop (black hex head mother-of-all. screw) is facing the rear of the wheel. Place the string over the bobbin ■...
  • Page 4 FOR WHEELS BUILT ON OR AFTER 1/19/12 Bring the string over the bobbin ■ and through the Scotch tension spring REMOVE THE FRONT MAIDEN bar on the left (figure B) Unscrew the knob on the quick ■ under the mother-of-all (figure B) ■...
  • Page 5 Place the loop over the large end of ■ INSTALL THE BULKY FLYER the bobbin, and the drive band over Loosen the front maiden so that it ■ the whorl. The drive band should be can be tipped toward you as you sit in taut but not overly tight.
  • Page 6 FOR ALL WHEELS Note: to keep your flyer in balance, always leave both hooks on the flyer. ADJUSTING THE FRONT MAIDEN We have adjusted the maiden stop CHECKING THE FLYER (black hex head screw) at the factory, After installing the flyer assembly, but you should check to see that it with the drive band off, spin the flyer is adjusted properly for your wheel.
  • Page 7: For Further Information

    A NOTE ABOUT TAKE-UP FOR FURTHER INFORMATION The bulky flyer on the cover shows BOOKS the Scotch tension set up, with the Get Spun: The Step-by-Step Guide to small end of the bobbin facing the Spinning Art Yarns by Symeon North front maiden, and using the optional The Intentional Spinner by Judith slow whorl.
  • Page 8 SPINNING ACCESSORIES The Schacht Niddy Noddy can make 1-1/2 or 2 yard skeins and it’s easy to get the skein off when fully loaded with yarn - just turn a knob! The Ni- ddy Noddy packs flat for travel, and is available in maple or cherry wood.