Physical Installation; Installation Of The Support Structure - Barco SLite Series Installation Manual

Fixed display
Hide thumbs Also See for SLite Series:
Table of Contents

Advertisement

3. PHYSICAL INSTALLATION

Overview

Installation of the Support Structure

Mounting the SLite tile
Cabling of the SLite display
3.1 Installation of the Support Structure
Follow the important Safety Guidelines.
What has to be done ?
The complete support structure has to be assembled and installed in its final position.
Screen supporting/securing structures vary from system to system. Consult Barco for advise on professional
rigging organizations.
Calibration tools for the SLite mounting plates.
BARCO provides mounting plates for the SLite tiles which has to be attached to the support structure. To align the mounting plates
correctly, the use of calibration tools is recommended. BARCO provides two different calibration tools. One to align the mounting
plates in a vertical direction and one to align in a horizontal direction.
A
Image 3-1
A
SLite mounting plate.
B
Calibration tool for vertical alignment of the SLite mounting plates.
C
Calibration tool for horizontal alignment of the SLite mounting plates.
R5976575 FIXED SLITE DISPLAY 17102003
B
C
3. Physical installation
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slite10Slite14R9004200R9004300

Table of Contents