2.4 Location Setup
2.4.1 Placement
The boiler must be level to function properly. To assist in leveling the boiler, the four (4) adjustable
leveling legs (1/2"- 13 NC) must be installed and adjusted accordingly. The adjustable legs also
provide adequate floor clearance and prevent distortion/twisting of the cabinet enclosure.
1.
Ensure the base is securely connected to the boiler.
2.
The boiler may be installed on a combustible floor (except carpeting) or a non-combustible
surface such as a concrete housekeeping pad.
Once the boiler is situated, use a bubble level and adjust the four 1/2"-13 leg bolts until the
3.
boiler is level.
The boiler must be level within 0.25° in order to function properly. Failure to heed this
Revised: January 3, 2020
Released: January 3, 2020
Never install boiler on carpeting.
warning could result in personal injury or death.
Patterson-Kelley 2020
All Rights Reserved.
Technical Service 1.877.728.5351
NOTE
1004905980 P-K MACH CM300-CM500&C750-C1050
Installation and Owners Manual (Rev F Jan-2020).docx
®
P-K MACH
Gas Fired Boiler
Page 5