Single Fuel Gas Train, Burner & Blower Assembly (C750-C900-C1050) - Patterson-Kelley P-K MACH CM300 Installation & Owner's Manual

Gas fired boiler
Table of Contents

Advertisement

7.4.4 Single Fuel Gas Train, Burner & Blower Assembly (C750-C900-C1050)
Mark
1
External (Upstream) Gas Cock
2
Stainless Steel Mesh Burner
3
4
5
Combustion Blower / Fan
6
7
Internal (Downstream) Gas Cock
8
High Gas Pressure Switch
Revised: January 3, 2020
Released: January 3, 2020
Description
(1" NPT-F)
Burner Gasket
Burner Hood
Air/Gas Venturi
(1" NPT-F)
 Patterson-Kelley 2020
All Rights Reserved.
P-K MACH
Technical Service 1.877.728.5351
Mark
Description
9
Main Gas Shutoff/Control Valve
10
Low Gas Pressure Switch
11
Gas Valve Flange
1" Flexible Gas Hose
12
1" Gas Pipe
13
14
Ionization Probe
15
Ignition Electrode
1004905980 P-K MACH CM300-CM500&C750-C1050
Installation and Owners Manual (Rev F Jan-2020).docx
®
Gas Fired Boiler
Page 87

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents