Single Fuel Gas Train, Burner & Blower Assembly High Turndown (C750T-C900T-C1050T) - Patterson-Kelley P-K MACH CM300 Installation & Owner's Manual

Gas fired boiler
Table of Contents

Advertisement

7.4.5 Single Fuel Gas Train, Burner & Blower Assembly High Turndown (C750T-C900T-
C1050T)
14
13
Mark
External (Upstream) Gas Cock
1
2
Stainless Steel Mesh Burner
3
4
5
Combustion Blower / Fan
6
7
Internal (Downstream) Gas Cock
8
Revised: January 3, 2020
Released: January 3, 2020
1
16
15
12
11
Description
(1" NPT-F)
Burner Gasket
Burner Hood
Air/Gas Venturi
Air Intake Guard
(1" NPT-F)
 Patterson-Kelley 2020
All Rights Reserved.
Technical Service 1.877.728.5351
2
10
9
8
Mark
9
High Gas Pressure Switch
10
Main Gas Shutoff/Control Valve
11
Low Gas Pressure Switch
12
13
14
15
16
1004905980 P-K MACH CM300-CM500&C750-C1050
Installation and Owners Manual (Rev F Jan-2020).docx
®
P-K MACH
Gas Fired Boiler
3
4
7
Description
Gas Valve Flange
1" Flexible Gas Hose
1" Gas Pipe
Ionization Probe
Ignition Electrode
Page 88
5
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents