Download Print this page
Mercia Garden Products 0619PNSH1227FBSD-V1 General Instructions Manual

Mercia Garden Products 0619PNSH1227FBSD-V1 General Instructions Manual

19mm log cabin, pent shed add on, 1.2m x 2.7m, fully boarded single door

Advertisement

Quick Links

General Instructions
0619PNSH1227FBSD-V1
19MM LOG CABIN, PENT SHED ADD ON, 1.2M X 2.7M, FULLY BOARDED SINGLE DOOR.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. the cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
head
measuring tape.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0619PNSH1227FBSD-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0619PNSH1227FBSD-V1

  • Page 1 EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. For assistance please contact customer care on: 01636 821215 Refer to the instructions pages for your speci c product code Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2 0619PNSH1227FBSD-V1 Please retain product label and instructions for future reference Overall Dimensions: Shed Extension Contents: Width = 1202mm Depth = 3043mm Height = 2378mm Base Dimensions: Bottom Gable QTY 1 Width = 1104mm AI-0619PNNE0403HGDD3SW-G-V1 Depth = 2508mm Before assembly Top Gable A QTY 1...
  • Page 3: Pre-Assembly

    Please retain product label and instructions for future reference Nail Bag Finisher Board - 54x19x1200mm QTY 1 There may be extra screws present in the nail bag LB19RG54-B-1200 40mm Screw x 146 60mm Bolt Set x 8 Roof Purlin - 40x90x1202mm Qty 2 F4090-B-1202 30mm Screw x 83 80mm Screw x 8...
  • Page 4 Please retain product label and instructions for future reference Pre-Assembly Step 1 Parts Needed - No. 24 QTY 2 No. 25 QTY 2 Follow the instructions for the 3m x 4m Log Cabin (0619PNNE0304HGDD3SW-V1) however DO NOT attach or Lay the bearers (No. 24 & 25) onto cut down the last roof board, Felt or the Fascia trims.
  • Page 5 Please retain product label and instructions for future reference Step 3 Step 2 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 25 QTY 7 Place the Bearers up against the bearers of the Log Cabin, ensuring Following the same method the bearers sit ush to the back of arrange the remaining bearers...
  • Page 6 Please retain product label and instructions for future reference Step 4 Step 5 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 30 QTY 1 Parts Needed - No. 13 QTY 1 No. 31 QTY 1 No. 14 QTY 1 No.
  • Page 7 Please retain product label and instructions for future reference Step 6 IMPORTANT: Pre-drill before xing screws. Step 7 Parts Needed - No. 13 QTY 1 No. 14 QTY 1 Fix the ‘U’ channel in place by No. 15 QTY 1 screwing through the ‘L frame’...
  • Page 8 Please retain product label and instructions for future reference Step 8 Step 9 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 14 QTY 5 Parts Needed - No. 2 QTY 1 IMPORTANT: Pre-drill before xing screws. No. 16 QTY 6 No.
  • Page 9 Please retain product label and instructions for future reference Step 12 Step 10 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 14 QTY 6 No. 16 QTY 6 Once you have laid 6 log boards (o of the starter) No.
  • Page 10 Please retain product label and instructions for future reference Step 14 Step 13 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 14 QTY 1 Parts Needed - No. 14 QTY 6 No. 16 QTY 1 No.
  • Page 11 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 15 Step 16 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 11 QTY 1 Parts Needed - No. 12a QTY 1 No. 12b QTY 1 No.
  • Page 12 Please retain product label and instructions for future reference Step 17 Step 18 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 23 QTY 2 Parts needed - No. 27 QTY 11 Align the Roof Purlins (No. Place the remaining roof board from 23) into the cut out slots on the the Log Cabin onto the roof.
  • Page 13 Please retain product label and instructions for future reference Step 20 Step 19 IMPORTANT: Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 1 QTY 1 Parts Needed - No. 29 QTY 2 No. 7 QTY 3 Ensuring the roof boards are ush at the Once the roof is xed, place the door overhanging side, x the eaves frames...
  • Page 14 Please retain product label and instructions for future reference Step 21 Step 22 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 8 QTY 1 Parts Needed - No. 28 QTY 11 No. 9 QTY 1 No.
  • Page 15 Please retain product label and instructions for future reference Step 25 Step 23 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 34 Parts needed - No. 32 QTY 3 Roof Roof Cut the felt into four strips cut to the Inside the building place the closure dimensions: trim (No.
  • Page 16 Please retain product label and instructions for future reference Step 27 Step 26 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 26 QTY 2 Parts needed - No. 33 QTY 4 Attach the fascia’s (No. 26), including the Arrange the storm braces (No.33) remaining fascias from the Log cabin, around around the building (internally), the building (ensuring to trap the felt in...
  • Page 17 Please retain product label and instructions for future reference Step 28 Parts Needed: No. 6 QTY 1 Attach the Rain Guard (No. 6) to the It is ESSENTIAL that you apply wood Window frame, xing in place onto treatment immediately after the building the framing above the window using has been assembled.