Download Print this page

Mercia Garden Products 0619RANE3503FGSD3TW-V1 General Instructions Manual

Advertisement

Quick Links

General Instructions
0619RANE3503FGSD3TW-V1
19MM LOG CABIN, REVERSE APEX, NO EXTRAS, 3.5X3M, FULLY GLAZED SINGLE DOOR, THREE TALL WINDOWS.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as
possible and annually to prevent the timber from deteriorating and to waterproof it.
This is required to maintain the anti-rot guarantee.
Log Cabins - Are supplied untreated and require a preservative and waterproo ng
treatment.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
measuring tape.
length
head
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0619RANE3503FGSD3TW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0619RANE3503FGSD3TW-V1

  • Page 1 For assistance please contact customer care on: 01636 821215 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2: Window Contents

    0619RANE3503FGSD3TW-V1 Please retain product label and instructions for future reference Single Door Contents Overall Dimensions: Width = 3528mm Depth = 3134mm Height = 2600mm Base Dimensions: Width = 3304mm Depth = 2804mm Before assembly please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Main Building Contents Bearer - 44x44x2804mm QTY 2 F4444-2804-PT Bearer - 44x44x3216mm QTY 10 F4444-3216-PT Gable - 2996mm QTY 1 Gable Window Notch- 2996mm QTY 1 (AI-0619RANE3503FGSD3TW-G) (AI-0619RANE3503FGSD3TW-GW) Roof Board - 121x12x1600mm QTY 66 MB16-C-1600 Starter Board - 66x19x3500mm QTY 2 Floor Board - 121x12x2760mm QTY 31...
  • Page 4: Pre-Assembly

    Please retain product label and instructions for future reference Pre-assembly Step 2 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 31 QTY 8 *Please note: Following the same method Each board interlocks at either end in a staggered pattern. arrange the remaining bearers (No.31) inside the assembled frame.
  • Page 5 Please retain product label and instructions for future reference Step 3 Step 4 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 19 QTY 2 Parts Needed - No. 20 QTY 6 No. 24 QTY 2 No. 22 QTY 6 No.
  • Page 6 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before xing screws. Step 6 IMPORTANT : Pre-drill before xing screws. Step 5 Parts Needed - No. 1 QTY 3 Parts Needed - No. 2 QTY 3 No. 3 QTY 3 Rest each window (No.
  • Page 7 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before xing screws. Step 7 Step 8 Parts Needed - No. 8 QTY 1 Parts Needed - No. 21 QTY 18 No. 9 QTY 1 No. 10 QTY 1 Once you have laid 6 boards (o No.
  • Page 8 Please retain product label and instructions for future reference Step 9 Step 10 Parts Needed - No. 21 QTY 18 Parts Needed - No. 20 QTY 6 No. 25 QTY 6 Once you have positioned the rst window and boards, locate the Once you have positioned the assembled door frame onto the log door frame and boards, locate one of...
  • Page 9 Please retain product label and instructions for future reference Step 12 Step 11 Parts Needed - No. 20 QTY 12 No. 22 QTY 6 Once you have laid 6 boards on each No. 24 QTY 6 side and positioned the front No.
  • Page 10 Please retain product label and instructions for future reference Step 13 Step 15 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 20 QTY 12 Parts Needed - No. 17 QTY 1 No. 22 QTY 6 No. 18 QTY 1 No.
  • Page 11 Please retain product label and instructions for future reference Step 16 IMPORTANT : Pre-drill before xing screws. Step 17 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 23 QTY 2 Parts needed - No. 26 QTY 3 Once the gables are in position Align Roof Purlin(s)
  • Page 12 Please retain product label and instructions for future reference Step 18 Step 19 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 32 QTY 66 Parts Needed - No. 27 QTY 2 Place the rst two roof board’s Ensuring the roof boards are ush at the overhanging side and meet at (No.32) onto either side of the log cabin,...
  • Page 13 Please retain product label and instructions for future reference Step 20 Step 21 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 7 QTY 1 Parts Needed - No. 14 QTY 1 No. 13 QTY 2 No.
  • Page 14 Please retain product label and instructions for future reference Step 22 IMPORTANT: Pre-drill before xing screws. Step 23 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 33 QTY 33 Parts needed - No. 35 QTY 7 oor board (No. 33) Roof Roof Place the...
  • Page 15 Please retain product label and instructions for future reference Step 25 Step 26 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 37 Parts Needed: No. 6 QTY 3 No. 12 QTY 1 Cut the felt into four strips of: 3624mm (L) X 1000mm (W) Attach the Rain Guards (No.
  • Page 16 Please retain product label and instructions for future reference Step 27 Step 28 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 28 QTY 4 Parts needed - No. 34 QTY 8 No. 29 QTY 2 Arrange the storm braces (No.
  • Page 17 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back It is ESSENTIAL to seal around all window framing with sillicone sealant (not included) to minimise water ingress.