Drilling the Ceiling/Support
Shelf
Using a plumb line mark the centre point
of the hob on the ceiling or support
shelf.
Position the drilling template item 21 on
the ceiling or support shelf ensuring the
template is aligned correctly with the
angles of the hob.
Mark the hole centres.
Pilot drill the fixing holes at the points
marked for the approprate size rawl
plugs and screws (not supplied).
It will also be necessary to drill a
Ø10mm hole for the mains cable and the
ducting if the hood is to be installed
ducted to the outside.

Fixing the Frame

IMPORTANT: Before fixing, separate
the Upper Chimney section 2.1 and the
Lower Chimney section 2.2 from the
frame by removing the screws 12c.
Then separate the two sections of the
frame by unscrewing the 8 screws
located on each side of the frame.

Upper Frame

Feed the mains cable through the frame
and the hole in the ceiling or support
shelf.
Fix the Upper Frame 7.1a to the ceiling
(screws not supplied).

Lower Frame

Fix the lower frame using the 8
screws removed earlier and adjust the
length according to the installation
height (the minimum distance before
fitting the hood body 1 must be 710mm).
When the hood is to be installed in the
recirculation mode, position the frame in
the direction you want the recirculated
air to pass into the kitchen.
The frame mountings must be secure
enough to withstand the weight of the
cooker hood and any knocks the hood
may get through normal ware and tear.