Seco Qseven CQ7-A30 User Manual page 48

Cross platform carrier board for qseven rel.2.0 compliant modules
Table of Contents

Advertisement

Not Connected
Power Ground
Hot Plug presence detect (needed to enable clock)
Not Connected
Please be aware that PCI-e management on CQ7-A30 carrier board requires that the add-in card placed on this slot manages the Presence Detect
pins (B31/B17 and A1). More exactly, according to the PCI Express Card Electromechanical Specification v3.0, it is required that these pins are tied
together on the ADD-in Card (at least, it is needed that pin A1 is connected with pin B17 or pin B31).
In case that these pins are not tied together on the add-in card, then the carrier board will not acknowledge the presence of the card in the slot, and
will not enable the reference clock (and the add-in card will not work).
The single PCI-express lanes that come out from Qseven
Slot. The switching between the single PCI-e x 16 slot and the different connectors is made using jumper JP1, which is a two-way P 2.54mm jumper.
JP1 position
Lane #0
Not inserted
miniPCI-e slot CN18
Inserted
According to the table above reported, when JP1 is not inserted, then three PCI-e x1 slots are singularly enabled.
Description
+12V Power Rail
+12V Power Rail
+12V Power Rail
Power Ground
SM Bus Clock line
SM Bus Data line
Power Ground
+3.3V Power Rail
Not connected
CQ7-A30
CQ7-A30 - Rev. First Edition: 1.0 - Last Edition: 2.0 - Author: S.B. - Reviewed by G.G. Copyright © 2016 SECO S.r.l.
N.C.
B79
GND
B80
PRSNT#2
B81
RSVD
B82
®
card edge connector can be alternatively routed to three (3) single PCI-e x1 lanes and one miniPCI-e
PCI-e lanes routing:
Lane #1
Lane #2
PCI-e x1 slot CN15
PCI-e x1 slot CN16
PCI-e x 16 slot CN14
PCI-e x1 Slot #1 - CN15
Pin name
Pin nr.
+12V_S
B1
+12V_S
B2
+12V_S
B3
GND
B4
SMB_CLK
B5
SMB_DAT
B6
GND
B7
+3.3V_S
B8
N.C.
B9
A79
GND
Power Ground
A80
N.C.
Not connected
A81
N.C.
Not connected
A82
GND
Power Ground
Lane #3
PCI-e x1 slot CN17
Pin nr.
Pin name
Description
A1
GND
Hot Plug presence detect (tied to GND)
A2
+12V_S
+12V Power Rail
A3
+12V_S
+12V Power Rail
A4
GND
Power Ground
A5
N.C.
Not connected
A6
N.C.
Not connected
A7
N.C.
Not connected
A8
N.C.
Not connected
A9
+3.3V_S
+3.3V Power Rail
48

Advertisement

Table of Contents
loading

Table of Contents