Appendix B Customer Checklist - GE Kelman TRANSFIX 1.6 Installation Manual

Transformer oil dissolved gas and moisture monitor
Table of Contents

Advertisement

The following checklist details items that the customer must acquire prior to the
installation:
Prepared, flat mounting surface
Parts to fabricate a mounting stand (if the product mounting stand has not been
purchased)—see Section 7.
Required number of stainless steel tubing lengths of 6 m (20 ft) each (see Section
8.3).
Fittings to adapt the transformer supply valve to a ¼ in. female NPT fitting (see
Section 8.2).
Fittings to adapt the transformer return valve to a ¼ in. female NPT fitting (see
Section 8.2).
¼ in. compression ball valve, if required (see Section 8.3).
¼ in. stainless steel compression unions (if the length of either tubing path
exceeds 6 m (20 ft) — see Section 8.3.
Communications option tested and located at the installation site (see Section 11).
Circuit capable of 110 V AC (100-121 V AC) or 230 V AC (207-253 V AC), 50/60 Hz
with suitable overcurrent protection as per local regulations (see Section 9). If heat
trace cable is used, the current capability of the circuit must be sufficient for both
the product and the heat trace cable.
Wiring and/or conduit for connection between the terminals within the product
and to the external switch or circuit breaker. This must be performed by a suitably
qualified electrician in accordance with local wiring regulations (see Section 9.1).
Tools and supplies needed to complete the installation (see Appendix A).
MA-001 – TRANSFIX-family Installation Manual – Rev 3.0
Appendix B
18-Jan-16
Customer Checklist
Page 35 of 55